Ventra Group Co., operating as Ventra Plastics - Peterborough - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-6093
Ministry reference number
2645-CGFMBB
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
September 29, 2022 - November 13, 2022 (45 days) Closed
Last updated

This consultation was open from:
September 29, 2022
to November 13, 2022

Decision summary

The company has withdrawn this application and the application has been closed.

Location details

Site address

775 Technology Drive
Peterborough, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Ventra Group Co., operating as Ventra Plastics - Peterborough
775 Technology Drive
Peterborough, ON
K9J 6X7
Canada

Decision details

The company has withdrawn this application and the application has been closed.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Appeals are not allowed

No decision on the issuance of this approval was made. The application was withdrawn by the applicant.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-6093
Ministry reference number
2645-CGFMBB
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

September 29, 2022 - November 13, 2022 (45 days)

Proposal details

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9828-89HQHP for Ventra Group Co., operating as Ventra Plastics - Peterborough, an automotive parts manufacturing facility located in City of Peterborough, County of Peterborough, Ontario.

The emission sources from the manufacturing and associated processes that exhaust to the air include:

  • resin pellet drying equipped with dust collection units
  • injection moulding
  • parts washing and drying
  • painting operations

Emissions to the air from this facility include:

  • ethylbenzene
  • nitrogen oxides
  • 2-ethylhexyl acetate
  • isobutyl acetate
  • n-butyl acetate
  • xylene
  • hexamethylene diisocyanate homopolymer
  • aromatic petroleum distillate
  • ethyl beta ethoxy proprionate
  • naphthalene
  • 1,2,4-trimethylbenzene

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from September 29, 2022
to November 13, 2022

Connect with us

Contact