Terrapure BR Ltd. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-6328
Ministry reference number
1000195262
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
November 23, 2022 - January 7, 2023 (45 days) Closed
Last updated

This consultation was open from:

November 23, 2022
to January 7, 2023

Proposal summary

This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 1198-8Q7KM6 for Terrapure BR Ltd., a secondary lead smelting and refining facility located in the City of Mississauga, Regional Municipality of Peel.

Location details

Site address

1333 Tonolli Road
Mississauga, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Terrapure BR Ltd.
1100 Burloak Drive, Suite 600/601
Burlington, ON
L7L 6B2
Canada

Proposal details

This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 1198-8Q7KM6 for Terrapure BR Ltd., a secondary lead smelting and refining facility located in the City of Mississauga, Regional Municipality of Peel.

The emission sources from the manufacturing and associated processes that exhaust to the air include

  • emission control equipment such as baghouse dust collectors and scrubbers
  • battery breaking operations
  • combustion equipment such as furnaces, kettles, and heaters

Emissions to the air from this facility include

  • nickel
  • sulphuric acid
  • iron
  • lead
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from November 23, 2022
to January 7, 2023

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice