Terrapure BR Ltd. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-6328
Numéro de référence du ministère
1000195262
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 23 novembre 2022 au 7 janvier 2023 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 23 novembre 2022
au 7 janvier 2023

Résumé de la proposition

This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 1198-8Q7KM6 for Terrapure BR Ltd., a secondary lead smelting and refining facility located in the City of Mississauga, Regional Municipality of Peel.

Détails de l'emplacement

Adresse du site

1333 Tonolli Road
Mississauga, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Terrapure BR Ltd.
1100 Burloak Drive, Suite 600/601
Burlington, ON
L7L 6B2
Canada

Détails de la proposition

This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 1198-8Q7KM6 for Terrapure BR Ltd., a secondary lead smelting and refining facility located in the City of Mississauga, Regional Municipality of Peel.

The emission sources from the manufacturing and associated processes that exhaust to the air include

  • emission control equipment such as baghouse dust collectors and scrubbers
  • battery breaking operations
  • combustion equipment such as furnaces, kettles, and heaters

Emissions to the air from this facility include

  • nickel
  • sulphuric acid
  • iron
  • lead
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 23 novembre 2022
au 7 janvier 2023