Heico 2004 Member, Inc. as the general partner for and on behalf of Ivaco Rolling Mills 2004 L.P. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-6675
Ministry reference number
0067-CN2MS7
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal Updated
Proposal posted
Comment period
March 20, 2023 - May 4, 2023 (45 days) Closed
Last updated

Update Announcement

This proposal notice was updated on August 30, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered

This consultation was open from:

March 20, 2023
to May 4, 2023

Proposal summary

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9151-8VDQQH for Heico 2004 Member, Inc. as the general partner for and on behalf of Ivaco Rolling Mills 2004 L.P., a electric arc furnace steelmaking facility located in L'Orignal, Ontario.

Location details

Site address

1040 County Road 17
Champlain Township, ON
Canada

Site location details

L'Orignal

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Heico 2004 Member, Inc. as the general partner for and on behalf of Ivaco Rolling Mills 2004 L.P.
1040 County Road 17
L'Orignal
Champlain Township, ON
K0B 1K0
Canada

Proposal details

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9151-8VDQQH for Heico 2004 Member, Inc. as the general partner for and on behalf of Ivaco Rolling Mills 2004 L.P.,, a electric arc furnace steelmaking facility located in L'Orignal, Ontario.

The emission sources from the manufacturing and associated processes that exhaust to the air include an electric arc furnace equipped with a baghouse, natural gas fired furnace, and baghouses.

The amendment includes update facility design to reduce noise emissions in accordance with the noise abatement plan.

Emissions to the air from this facility include:

  • nitrogen oxides
  • particulate matter
  • calcium oxide
  • metal such as iron, lead and manganese
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from March 20, 2023
to May 4, 2023