Freymond Lumber Limited - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-6711
Ministry reference number
1000208996
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal Updated
Proposal posted
Comment period
March 2, 2023 - April 16, 2023 (45 days) Closed
Last updated

Update Announcement

This proposal notice was updated on August 30, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered

This consultation was open from:

March 2, 2023
to April 16, 2023

Proposal summary

The proposal is for a new Environmental Compliance Approval for Freymond Lumber Limited for stormwater management works serving Phase 1 of the Freymond Quarry, located at 2287 Bay Lake Road in Bancroft, Ontario.

Location details

Site address

2287 Bay Lake Road
Bancroft, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Freymond Lumber Limited
2287 Bay Lake Road
Bancroft, ON
K0L 1C0
Canada

Proposal details

The proposal is for a new Environmental Compliance Approval for Freymond Lumber Limited for stormwater management works at the Freymond Quarry, located at 2287 Bay Lake Road in Bancroft, Ontario.

The stormwater management works comprise of a stormwater management dry pond, also referred to as an infiltration cell, that will contain and manage stormwater runoff from Phase 1 of the Freymond Quarry. The infiltration cell is proposed for the east corner of the site, in the designated area for the stormwater management pond.

While Phase 1 is being extracted, the proposed infiltration cell will provide quality, quantity, and erosion control protection by infiltrating all stormwater runoff from storm events up to and including the 100-year event.

The proposed infiltration cell is sized to fully infiltrate all runoff, with no outlet. The infiltration cell will have no direct discharge to a water body nor a water channel. Infiltration will occur from the bottom of the infiltration cell. The infiltration cell will be inspected regularly after storm events to ensure it is performing properly.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from March 2, 2023
to April 16, 2023