Pure North Resources Inc. - Permit to take water

Instrument type: Permit to take water

ERO number
019-6777
Ministry reference number
4302-CPCHUM
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
March 17, 2023 - April 16, 2023 (30 days) Closed
Last updated

This consultation was open from:

March 17, 2023
to April 16, 2023

Proposal summary

This proposal is to renew Permit to Take Water No. 4137-8MYQWU for Pure North Resources Inc. Water will be taken for industrial and dewatering purposes at the Hart Mine and McWatters Mine sites, located in Timmins, Ontario.

Location details

Site address

Timmins, ON
Canada

Site location details

Hart Mine approximately 26.5 kilometres south east from Timmins and 7 kilometres east from Redstone Mine.

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Pure North Resources Inc.
Post Office Box No. 5114
South Porcupine, ON
P0N 1H0
Canada

Proposal details

This proposal is to renew Permit to Take Water No. 4137-8MYQWU for Pure North Resources Inc. Water will be taken for industrial and dewatering purposes at the Hart Mine and McWatters Mine sites, located in Timmins, Ontario.Details of the water taking are as follows:

Source name: Hart Mine Ramp/Normal Operational Rate

  • purpose: dewatering
  • maximum rate per minute (litres): 420
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 605,000
  • maximum number of days of taking per year: 245
  • period of taking: January 1 to December 31 for 10 years

Source name: Hart Mine Ramp/Spring Freshet Rate

  • purpose: dewatering
  • maximum rate per minute (litres): 694
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 1,000,000
  • maximum number of days of taking per year: 120
  • period of taking: April 1 to June 30 for 10 years

Source name: McWatters Water Pond

  • purpose: industrial
  • maximum rate per minute (litres): 208
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 300,000
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 1 permit.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from March 17, 2023
to April 16, 2023

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice