Update Announcement
This proposal notice was updated on September 17th, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered.
Cette consultation a eu lieu :
du 17 mars 2023
au 16 avril 2023
Résumé de la proposition
This proposal is to renew Permit to Take Water No. 4137-8MYQWU for Pure North Resources Inc. Water will be taken for industrial and dewatering purposes at the Hart Mine and McWatters Mine sites, located in Timmins, Ontario.
Détails de l'emplacement
Adresse du site
Timmins,
ON
Canada
Détails de l'emplacement du site
Hart Mine approximately 26.5 kilometres south east from Timmins and 7 kilometres east from Redstone Mine.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Pure North Resources Inc.
Post Office Box No. 5114
South Porcupine,
ON
P0N 1H0
Canada
Détails de la proposition
This proposal is to renew Permit to Take Water No. 4137-8MYQWU for Pure North Resources Inc. Water will be taken for industrial and dewatering purposes at the Hart Mine and McWatters Mine sites, located in Timmins, Ontario.Details of the water taking are as follows:
Source name: Hart Mine Ramp/Normal Operational Rate
- purpose: dewatering
- maximum rate per minute (litres): 420
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 605,000
- maximum number of days of taking per year: 245
- period of taking: January 1 to December 31 for 10 years
Source name: Hart Mine Ramp/Spring Freshet Rate
- purpose: dewatering
- maximum rate per minute (litres): 694
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 1,000,000
- maximum number of days of taking per year: 120
- period of taking: April 1 to June 30 for 10 years
Source name: McWatters Water Pond
- purpose: industrial
- maximum rate per minute (litres): 208
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 300,000
- maximum number of days of taking per year: 365
- period of taking: January 1 to December 31 for 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 17 mars 2023
au 16 avril 2023