Westboro Inc. - Permit to take water

Instrument type: Permit to take water

ERO number
019-7044
Ministry reference number
8611-CQY998
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal Updated
Proposal posted
Comment period
May 5, 2023 - June 4, 2023 (30 days) Closed
Last updated

Update Announcement

This proposal notice was updated on August 30, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered.

This consultation was open from:

May 5, 2023
to June 4, 2023

Proposal summary

This proposal is for a Permit to Take Water for Westboro Inc. Water will be taken from two ponds for construction dewatering and remediation purposes.

Location details

Site address

403 Richmond Road
Ottawa, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Westboro Inc.
318 Wellington Street West
Toronto, ON
M5V 3T4
Canada

Proposal details

This proposal is for a Permit to Take Water for Westboro Inc. Water will be taken from two ponds for construction dewatering and remediation purposes. Details of the water taking are as follows:

Permit type – New

Source name: S1 - building excavation

  • purpose: construction dewatering
  • maximum rate per minute (litres): 7,000
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 5,000,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): July 1st
  • latest calendar date of taking (mm/dd): June 30th
  • period of taking: 5 years

Source name: S2 - miscellaneous

  • purpose: remediation
  • maximum rate per minute (litres): 2,800
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 500,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): July 1st
  • latest calendar date of taking (mm/dd): June 30th
  • period of taking: 5 Years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from May 5, 2023
to June 4, 2023

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice