Westboro Inc. - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-7044
Numéro de référence du ministère
8611-CQY998
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 5 mai 2023 au 4 juin 2023 (30 jours) Fermé
Dernière mise à jour

Update Announcement

This proposal notice was updated on August 30, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered.

Cette consultation a eu lieu :

du 5 mai 2023
au 4 juin 2023

Résumé de la proposition

This proposal is for a Permit to Take Water for Westboro Inc. Water will be taken from two ponds for construction dewatering and remediation purposes.

Détails de l'emplacement

Adresse du site

403 Richmond Road
Ottawa, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Westboro Inc.
318 Wellington Street West
Toronto, ON
M5V 3T4
Canada

Détails de la proposition

This proposal is for a Permit to Take Water for Westboro Inc. Water will be taken from two ponds for construction dewatering and remediation purposes. Details of the water taking are as follows:

Permit type – New

Source name: S1 - building excavation

  • purpose: construction dewatering
  • maximum rate per minute (litres): 7,000
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 5,000,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): July 1st
  • latest calendar date of taking (mm/dd): June 30th
  • period of taking: 5 years

Source name: S2 - miscellaneous

  • purpose: remediation
  • maximum rate per minute (litres): 2,800
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 500,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): July 1st
  • latest calendar date of taking (mm/dd): June 30th
  • period of taking: 5 Years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 5 mai 2023
au 4 juin 2023

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis