Richard Allen Vaillancourt - Environmental Compliance Approval (waste)

Instrument type: Environmental Compliance Approval (waste)

ERO number
019-7638
Ministry reference number
2549-CVNHL4
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
September 18, 2023 - November 2, 2023 (45 days) Closed
Last updated

This consultation was open from:

September 18, 2023
to November 2, 2023

Proposal summary

This proposal is for the renewal of Environmental Compliance Approval No. 19-NOR-55232 for Rick Allen Vaillancourt for a hauled sewage waste disposal site. The application is for the dewatering trench of residential hauled sewage in the Township of Machar, Ontario.

Location details

Site address

Lot 31, Concession 6
Machar, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Richard Allen Vaillancourt
92 Goresville Road
Laurier, ON
P0A 1X0
Canada

Proposal details

Proposal details

Hauled Sewage, commonly known as septage, is the waste material removed from portable toilets, sewage holding tanks and septic systems. Untreated hauled sewage from holding tanks and septic tanks may be disposed of on land in accordance with an Environmental Compliance Approval (ECA) issued under the Environmental Protection Act (EPA).

This proposal is for the issuance of an Environmental Compliance Approval for a hauled sewage disposal site.

Site details

  • application type: renewal
  • total useable area: 1 hectare
  • type of disposal: dewatering trench
  • number of trenches: 2

Highlights of proposed approval requirements

  • prior to operating at the site, the company shall develop written procedures covering the following:
    • procedures for reporting to the ministry, and municipal authorities as required in the event a spill occurs at the site
    • a list of the personnel responsible for operations at the site
  • the company shall ensure that all personnel involved in the operation of this hauled sewage disposal site are aware of the requirements of this approval and are trained in Spill Prevention
  • spills of a pollutant that cause or may cause an adverse effect are to be reported to the Ministry's Spills Action Centre and the company shall take appropriate remedial action to limit the impact
  • the company must ensure that no unnecessary off-site effects, such as vermin, vectors, odour, dust, litter, noise or traffic, result from the operation of this site
  • written records must be maintained in a log book that documents daily operations as well as any spills that occur and any complaints received
  • the two dewatering trenches must be designed and constructed according to specified standards set out in the approval
  • the dewatering trenches must be operated in accordance with specified standards set out in the approval which include maximum volumes that can be put in a trench, rotating the use of the trenches, ensuring trenches have a rest period and cleaning residuals from the trenches on a regular basis
  • a closure plan shall be developed for the site and the site must be closed in accordance with the plan
  • surface or ground water monitoring conditions may be required

Other

Prior to the spreading of hauled sewage, the operator is responsible for ensuring that all necessary approvals, licences or permits that may be required from other authorities, such as the local municipality, conservation authority, MNRF and OMAFRA, have been acquired.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from September 18, 2023
to November 2, 2023

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice