Richard Allen Vaillancourt - Environmental Compliance Approval (waste)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (waste)

Numéro du REO
019-7638
Numéro de référence du ministère
2549-CVNHL4
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 18 septembre 2023 au 2 novembre 2023 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 18 septembre 2023
au 2 novembre 2023

Résumé de la proposition

This proposal is for the renewal of Environmental Compliance Approval No. 19-NOR-55232 for Rick Allen Vaillancourt for a hauled sewage waste disposal site. The application is for the dewatering trench of residential hauled sewage in the Township of Machar, Ontario.

Détails de l'emplacement

Adresse du site

Lot 31, Concession 6
Machar, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Richard Allen Vaillancourt
92 Goresville Road
Laurier, ON
P0A 1X0
Canada

Détails de la proposition

Proposal details

Hauled Sewage, commonly known as septage, is the waste material removed from portable toilets, sewage holding tanks and septic systems. Untreated hauled sewage from holding tanks and septic tanks may be disposed of on land in accordance with an Environmental Compliance Approval (ECA) issued under the Environmental Protection Act (EPA).

This proposal is for the issuance of an Environmental Compliance Approval for a hauled sewage disposal site.

Site details

  • application type: renewal
  • total useable area: 1 hectare
  • type of disposal: dewatering trench
  • number of trenches: 2

Highlights of proposed approval requirements

  • prior to operating at the site, the company shall develop written procedures covering the following:
    • procedures for reporting to the ministry, and municipal authorities as required in the event a spill occurs at the site
    • a list of the personnel responsible for operations at the site
  • the company shall ensure that all personnel involved in the operation of this hauled sewage disposal site are aware of the requirements of this approval and are trained in Spill Prevention
  • spills of a pollutant that cause or may cause an adverse effect are to be reported to the Ministry's Spills Action Centre and the company shall take appropriate remedial action to limit the impact
  • the company must ensure that no unnecessary off-site effects, such as vermin, vectors, odour, dust, litter, noise or traffic, result from the operation of this site
  • written records must be maintained in a log book that documents daily operations as well as any spills that occur and any complaints received
  • the two dewatering trenches must be designed and constructed according to specified standards set out in the approval
  • the dewatering trenches must be operated in accordance with specified standards set out in the approval which include maximum volumes that can be put in a trench, rotating the use of the trenches, ensuring trenches have a rest period and cleaning residuals from the trenches on a regular basis
  • a closure plan shall be developed for the site and the site must be closed in accordance with the plan
  • surface or ground water monitoring conditions may be required

Other

Prior to the spreading of hauled sewage, the operator is responsible for ensuring that all necessary approvals, licences or permits that may be required from other authorities, such as the local municipality, conservation authority, MNRF and OMAFRA, have been acquired.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 18 septembre 2023
au 2 novembre 2023

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis