Danyle Group Inc. - Environmental Compliance Approval (waste)

Instrument type: Environmental Compliance Approval (waste)

ERO number
019-8019
Ministry reference number
7449-CV8NPE
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
December 7, 2023 - January 21, 2024 (45 days) Closed
Last updated

This consultation was open from:

December 7, 2023
to January 21, 2024

Proposal summary

This proposal is to amend Environmental Compliance Approval (waste disposal site) No. 5010-98JKZE for Danyle Group Inc. The facility is 0.9-hectares in area and is located at 51 Shorncliffe Road, Toronto, Ontario.

Location details

Site address

51 Shorncliffe Road
Toronto, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Danyle Group Inc.
51 Shorncliffe Road
Toronto, ON
M8Z 5K2
Canada

Proposal details

This proposal is to amend Environmental Compliance Approval (waste disposal site) No. 5010-98JKZE for Danyle Group Inc. The facility is 0.9-hectares in area and is located at 51 Shorncliffe Road, Toronto, Ontario.

The facility services the Greater Toronto Area and accepts solid non-hazardous waste from IC&I and C&D sectors for processing and transfer. The facility operates from 7:00 a.m. to 7:00 p.m., Monday to Saturday, year round. Additionally, the facility accepts clean soil and rubble from residential sources for off-site transfer to approved facilities.

Processes at the facility include manual sorting of waste to divert recyclables from landfill. Recycled materials and residual waste are sent offsite for disposal at approved facilities.

The amendment application seeks to allow Limited Operational Flexibility for the categories of recyclable materials and placement of recyclable material bins at the facility. Additionally, the amendment clarifies the construction details of the waste storage building, allows for offsite shipment of prohibited materials within two business days, and allow for other business opportunities in the site plan, other than waste management.

The Environmental Compliance Approval with Operational Flexibility (waste), when issued, permits pre-determined modifications to the site’s operations without a requirement to make an application for amendment to the Environmental Compliance Approval (waste).

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from December 7, 2023
to January 21, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice