TOYOTA MOTOR MANUFACTURING CANADA INC - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-8234
Ministry reference number
1000212456
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
February 6, 2024 - March 22, 2024 (45 days) Closed
Last updated

This consultation was open from:

February 6, 2024
to March 22, 2024

Proposal summary

This proposal, part of a multi-media Environmental Compliance Approval application, is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (Air&Noise) No. 4479-92MS2T for Toyota Motor Manufacturing Canada Inc., a vehicle assembly facility located in the City of Cambridge, Ontario.

Location details

Site address

1055 Fountain Street North
Cambridge, ON
N3H 5K2
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

TOYOTA MOTOR MANUFACTURING CANADA INC
1055 FOUNTAIN STREET NORTH
CAMBRIDGE, ON
N3H 5K2
Canada

Proposal details

This proposal, part of a multi-media Environmental Compliance Approval application, is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (Air & Noise) No. 4479-92MS2T for Toyota Motor Manufacturing Canada Inc., a vehicle assembly facility located in the City of Cambridge, Ontario.

The emission sources from the assembling and associated processes that exhaust to the air include: boilers, ovens, emission control devices, welding, paint spray booths, and incinerators. Emissions to the air from this facility include:

  • ethyl-3-ethoxyproprionate
  • nitrogen oxides
  • 2-butoxy ethanol
  • trimethylbenzenes
  • 2-ethyl hexanol
  • ethylene glycol
  • mono-2-ethylhexyl ether
  • benzene
  • particulate matter
  • nitrogen oxides
  • sulphur oxides

The Environmental Compliance Approval with Limited Operational Flexibility, when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility. The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from February 6, 2024
to March 22, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice