Ontario Power Generation Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-8876
Ministry reference number
2769-D52RF3
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
June 28, 2024 - August 12, 2024 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
August 12, 2024

Proposal summary

This proposal is for an amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air) No. 9277-ANDJ3R for Ontario Power Generation Inc., a waste management facility located in the Town of Kincardine, Ontario.

Location details

Site address

Lot 19 and 20, Concession 4
Kincardine, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Ontario Power Generation Inc.
177 Tie Road
P.O. Box 7000 B21
Tiverton, ON
N0G 2T0
Canada

Proposal details

This proposal is for an amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air) No. 9277-ANDJ3R for Ontario Power Generation Inc., a waste management facility located in the Town of Kincardine, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include:

  • the two-stage thermal incinerator,
  • baghouse dust collector,
  • combustion chambers,
  • standby generators, and
  • ventilation exhaust from the lime silo and dry storage facility

The amendment includes the request for NO2and SO2 exemptions for OPG Continuous Emissions Monitoring System (CEMS) and the removal of negligible sources listed on the ECA, removal of requirement to submit written summary report (condition 6) and changes to the due date for ESDM report updates. There is no change to emissions sources or associated processes that discharge to the air.

Emissions to the air from this facility include:

  • nitrogen oxides,
  • chromium (hexavalent forms),
  • hydrogen chloride,
  • benzo(a)pyrene, and
  • acrolein

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice