Ontario Power Generation Inc. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-8876
Numéro de référence du ministère
2769-D52RF3
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 28 juin 2024 au 12 août 2024 (45 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
12 août 2024

Résumé de la proposition

This proposal is for an amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air) No. 9277-ANDJ3R for Ontario Power Generation Inc., a waste management facility located in the Town of Kincardine, Ontario.

Détails de l'emplacement

Adresse du site

Lot 19 and 20, Concession 4
Kincardine, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Ontario Power Generation Inc.
177 Tie Road
P.O. Box 7000 B21
Tiverton, ON
N0G 2T0
Canada

Détails de la proposition

This proposal is for an amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air) No. 9277-ANDJ3R for Ontario Power Generation Inc., a waste management facility located in the Town of Kincardine, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include:

  • the two-stage thermal incinerator,
  • baghouse dust collector,
  • combustion chambers,
  • standby generators, and
  • ventilation exhaust from the lime silo and dry storage facility

The amendment includes the request for NO2and SO2 exemptions for OPG Continuous Emissions Monitoring System (CEMS) and the removal of negligible sources listed on the ECA, removal of requirement to submit written summary report (condition 6) and changes to the due date for ESDM report updates. There is no change to emissions sources or associated processes that discharge to the air.

Emissions to the air from this facility include:

  • nitrogen oxides,
  • chromium (hexavalent forms),
  • hydrogen chloride,
  • benzo(a)pyrene, and
  • acrolein

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis