H & H Construction Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-9082
Ministry reference number
6906-D6BS5L
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
August 22, 2024 - October 6, 2024 (45 days) Closed
Last updated

This consultation was open from:

August 22, 2024
to October 6, 2024

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for H & H Construction Inc., a hot mix asphalt manufacturing facility, located in the Town of Petawawa, Ontario.

Location details

Site address

Lot 17, Concession 7, Geographic Township of Petawawa
Petawawa, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

H & H Construction Inc.
49 Portage Road
Petawawa, ON
K8H 2W8
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from H & H Construction Inc., a hot mix asphalt (HMA) manufacturing facility, located in the Town of Petawawa, Ontario.

The application includes all sources at the facility, including unloading and heating of aggregate, the combining of aggregate and liquid asphalt cement to produce HMA, the storage of HMA in silos and the unloading of HMA from the silos to trucks and truck related movements.

Emissions to the air from this facility include:

  • particulate matter
  • nitrogen oxides
  • carbon monoxide
  • sulphur dioxide
  • benzo(a)pyrene
  • ethylene

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from August 22, 2024
to October 6, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice