H & H Construction Inc. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-9082
Numéro de référence du ministère
6906-D6BS5L
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 22 août 2024 au 6 octobre 2024 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 22 août 2024
au 6 octobre 2024

Résumé de la proposition

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for H & H Construction Inc., a hot mix asphalt manufacturing facility, located in the Town of Petawawa, Ontario.

Détails de l'emplacement

Adresse du site

Lot 17, Concession 7, Geographic Township of Petawawa
Petawawa, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

H & H Construction Inc.
49 Portage Road
Petawawa, ON
K8H 2W8
Canada

Détails de la proposition

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from H & H Construction Inc., a hot mix asphalt (HMA) manufacturing facility, located in the Town of Petawawa, Ontario.

The application includes all sources at the facility, including unloading and heating of aggregate, the combining of aggregate and liquid asphalt cement to produce HMA, the storage of HMA in silos and the unloading of HMA from the silos to trucks and truck related movements.

Emissions to the air from this facility include:

  • particulate matter
  • nitrogen oxides
  • carbon monoxide
  • sulphur dioxide
  • benzo(a)pyrene
  • ethylene

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 22 août 2024
au 6 octobre 2024

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis