Lincoln Electric Company of Canada Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-9183
Ministry reference number
4852-D7VKM8
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
September 11, 2024 - October 26, 2024 (45 days) Closed
Last updated

This consultation was open from:

September 11, 2024
to October 26, 2024

Proposal summary

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0643-ADUPLW for Lincoln Electric Company of Canada Limited, a welding wire and welding equipment production facility, located in the City of Toronto, Ontario.

Location details

Site address

163 and 179 Wicksteed Avenue
Toronto, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Lincoln Electric Company of Canada Limited
179 Wicksteed Avenue
Toronto, ON
M4G 2B9
Canada

Proposal details

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0643-ADUPLW for Lincoln Electric Company of Canada Limited, a welding wire and welding equipment production facility, located in the City of Toronto, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include stamping, welding, storage and shipping, combustion equipment, solder pots, paint booths, dip tanks, dust collectors, a scrubber, acid wash tanks, and cooling towers. The amendment is to renew the Limited Operational Flexibility, increase the facility production limit, and update current sources. Emissions to the air from this facility include:

  • calcium hydroxide,
  • hydrogen chloride,
  • lead and lead compounds,
  • nickel and nickel compounds,
  • particulate matter,
  • nitrogen oxides, and
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from September 11, 2024
to October 26, 2024