Lincoln Electric Company of Canada Limited - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-9183
Numéro de référence du ministère
4852-D7VKM8
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 11 septembre 2024 au 26 octobre 2024 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 11 septembre 2024
au 26 octobre 2024

Résumé de la proposition

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0643-ADUPLW for Lincoln Electric Company of Canada Limited, a welding wire and welding equipment production facility, located in the City of Toronto, Ontario.

Détails de l'emplacement

Adresse du site

163 and 179 Wicksteed Avenue
Toronto, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Lincoln Electric Company of Canada Limited
179 Wicksteed Avenue
Toronto, ON
M4G 2B9
Canada

Détails de la proposition

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0643-ADUPLW for Lincoln Electric Company of Canada Limited, a welding wire and welding equipment production facility, located in the City of Toronto, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include stamping, welding, storage and shipping, combustion equipment, solder pots, paint booths, dip tanks, dust collectors, a scrubber, acid wash tanks, and cooling towers. The amendment is to renew the Limited Operational Flexibility, increase the facility production limit, and update current sources. Emissions to the air from this facility include:

  • calcium hydroxide,
  • hydrogen chloride,
  • lead and lead compounds,
  • nickel and nickel compounds,
  • particulate matter,
  • nitrogen oxides, and
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 11 septembre 2024
au 26 octobre 2024

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis