This consultation closes at 11:59 p.m. on:
November 22, 2024
Proposal summary
This proposal is for a multi-media Environmental Compliance Approval (waste disposal site, air & noise and industrial sewage) for Waste Management of Canada Corporation, for a waste processing facility located at 19 Rockland Road North Dumfries, Ontario.
Location details
Site address
19 Rockland Road
North Dumfries,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Waste Management of Canada Corporation
407 McNeilly Road
Stoney Creek,
ON
L8E 5E3
Canada
Proposal details
This proposal is for a multi-media Environmental Compliance Approval (waste disposal site, air & noise and industrial sewage) for Waste Management of Canada Corporation, for a waste processing facility located at 19 Rockland Road North Dumfries, Ontario.
Waste Disposal Site
Waste Management of Canada Corporation (WMCC) proposes to develop, own and operate a new enclosed non-hazardous recycling facility. The recycling facility is 5.26 hectares area within a total site area of 7.24 hectares. The new recycling facility will receive solid, non-hazardous recyclables (primarily blue box recyclables), including various plastics, metals, and paper/fibres, and separate them into “like” products. The recycling facility will have an Ontario service area, and the hours of operation will be 7:00 a.m. to 7:00 p.m. five days per week, with a night shift for maintenance work. WMCC is proposing to receive up to 750 tonnes per day of Single Source Recyclable (SSR) materials. For storage, it is proposed the total amount of unprocessed, processed, and residual waste stored on-site, shall not exceed 1,000 tonnes at any time.
Air & Noise
Sources of air and noise emissions at the facility include a dust collection system, maintenance welding, and fugitive emissions from the operations from the transfer/processing facilities.
Contaminant emissions to the atmosphere include particulate matter.
Industrial Sewage
Stormwater management works at the site consist of an existing stormwater management pond (SWMP) on a 1 hectare area, collecting stormwater runoff from an approximately 8.5 hectare drainage area to provide water quality and quantity control as per regulatory requirements. The SWMP discharges to the Canadian Pacific Railway ditch, adjacent to the SWMP, which ultimately discharges to a tributary of Cedar Creek.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada