Cette consultation a eu lieu :
du 8 octobre 2024
au 22 novembre 2024
Résumé de la proposition
This proposal is for a multi-media Environmental Compliance Approval (waste disposal site, air & noise and industrial sewage) for Waste Management of Canada Corporation, for a waste processing facility located at 19 Rockland Road North Dumfries, Ontario.
Détails de l'emplacement
Adresse du site
19 Rockland Road
North Dumfries,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Waste Management of Canada Corporation
407 McNeilly Road
Stoney Creek,
ON
L8E 5E3
Canada
Détails de la proposition
This proposal is for a multi-media Environmental Compliance Approval (waste disposal site, air & noise and industrial sewage) for Waste Management of Canada Corporation, for a waste processing facility located at 19 Rockland Road North Dumfries, Ontario.
Waste Disposal Site
Waste Management of Canada Corporation (WMCC) proposes to develop, own and operate a new enclosed non-hazardous recycling facility. The recycling facility is 5.26 hectares area within a total site area of 7.24 hectares. The new recycling facility will receive solid, non-hazardous recyclables (primarily blue box recyclables), including various plastics, metals, and paper/fibres, and separate them into “like” products. The recycling facility will have an Ontario service area, and the hours of operation will be 7:00 a.m. to 7:00 p.m. five days per week, with a night shift for maintenance work. WMCC is proposing to receive up to 750 tonnes per day of Single Source Recyclable (SSR) materials. For storage, it is proposed the total amount of unprocessed, processed, and residual waste stored on-site, shall not exceed 1,000 tonnes at any time.
Air & Noise
Sources of air and noise emissions at the facility include a dust collection system, maintenance welding, and fugitive emissions from the operations from the transfer/processing facilities.
Contaminant emissions to the atmosphere include particulate matter.
Industrial Sewage
Stormwater management works at the site consist of an existing stormwater management pond (SWMP) on a 1 hectare area, collecting stormwater runoff from an approximately 8.5 hectare drainage area to provide water quality and quantity control as per regulatory requirements. The SWMP discharges to the Canadian Pacific Railway ditch, adjacent to the SWMP, which ultimately discharges to a tributary of Cedar Creek.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 8 octobre 2024
au 22 novembre 2024