MRT Aggregate Inc. - Permit to take water

Instrument type: Permit to take water

ERO number
019-9366
Ministry reference number
1681-DA4P36
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
November 8, 2024 - December 8, 2024 (30 days) Closed
Last updated

This consultation was open from:

November 8, 2024
to December 8, 2024

Proposal summary

This proposal is for the renewal of Permit to Take Water No. 0336-9QCPUA for MRT Aggregate Inc. Water will be taken from one well and two ponds for industrial and dewatering purposes at 4999 County Road 46 located in the Township of Havelock-Belmont-Methuen, Ontario.

Location details

Site address

4999 County Road 46
Lot 7, Concession 3
Havelock-Belmont-Methuen, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

MRT Aggregate Inc.
281 Hillmount Road
Markham, ON
L3C 2S3
Canada

Proposal details

This proposal is for the renewal of Permit to Take Water No. 0336-9QCPUA for MRT Aggregate Inc. Water will be taken from one well and two ponds for industrial and dewatering purposes at 4999 County Road 46 located in the Township of Havelock-Belmont-Methuen, Ontario. Details of water taking will be as follows:

Source Name: TW-1

  • source type: well
  • purpose: aggregate washing
  • maximum rate taken per minute (litres): 208
  • maximum number of hours of taking in a day: 24
  • maximum volume per day (litres): 300,000
  • maximum number of days taken per in a year: 207
  • period of water taking: April 1 to October 31 for 10 years

Source Name: Quarry Pond #1

  • source type: pond
  • purpose: dewatering
  • maximum rate taken per minute (litres): 4,167
  • maximum number of hours of taking in a day: 24
  • maximum volume per day (litres): 6,000,480
  • maximum number of days taken per in a year: 365
  • period of water taking: January 1 to December 31 for 10 years

Source Name: Quarry Pond #2

  • source type: pond
  • purpose: industrial (aggregate washing and dust control)
  • maximum rate taken per minute (litres): 4,500
  • maximum number of hours of taking in a day: 14
  • maximum volume per day (litres): 3,778,000
  • maximum number of days taken per in a year: 180
  • period of water taking: April 1 to September 30 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from November 8, 2024
to December 8, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice