Cette consultation a eu lieu :
du 8 novembre 2024
au 8 décembre 2024
Résumé de la proposition
This proposal is for the renewal of Permit to Take Water No. 0336-9QCPUA for MRT Aggregate Inc. Water will be taken from one well and two ponds for industrial and dewatering purposes at 4999 County Road 46 located in the Township of Havelock-Belmont-Methuen, Ontario.
Détails de l'emplacement
Adresse du site
4999 County Road 46
Lot 7, Concession 3
Havelock-Belmont-Methuen,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
MRT Aggregate Inc.
281 Hillmount Road
Markham,
ON
L3C 2S3
Canada
Détails de la proposition
This proposal is for the renewal of Permit to Take Water No. 0336-9QCPUA for MRT Aggregate Inc. Water will be taken from one well and two ponds for industrial and dewatering purposes at 4999 County Road 46 located in the Township of Havelock-Belmont-Methuen, Ontario. Details of water taking will be as follows:
Source Name: TW-1
- source type: well
- purpose: aggregate washing
- maximum rate taken per minute (litres): 208
- maximum number of hours of taking in a day: 24
- maximum volume per day (litres): 300,000
- maximum number of days taken per in a year: 207
- period of water taking: April 1 to October 31 for 10 years
Source Name: Quarry Pond #1
- source type: pond
- purpose: dewatering
- maximum rate taken per minute (litres): 4,167
- maximum number of hours of taking in a day: 24
- maximum volume per day (litres): 6,000,480
- maximum number of days taken per in a year: 365
- period of water taking: January 1 to December 31 for 10 years
Source Name: Quarry Pond #2
- source type: pond
- purpose: industrial (aggregate washing and dust control)
- maximum rate taken per minute (litres): 4,500
- maximum number of hours of taking in a day: 14
- maximum volume per day (litres): 3,778,000
- maximum number of days taken per in a year: 180
- period of water taking: April 1 to September 30 for 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 8 novembre 2024
au 8 décembre 2024