Cette consultation a eu lieu :
du 10 janvier 2025
au 24 février 2025
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) to establish a stormwater management works facility and a wash water/non‐agricultural source materials tank serving an existing meat processing plant, in support of a proposed expansion development of a site located at 3900 Elginfield Road, in North Middlesex/Parkhill, Ontario.
Détails de l'emplacement
Adresse du site
3900 Elginfield Road
Municipality of North Middlesex,
ON
Canada
Détails de l'emplacement du site
Parkhill Meats
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Parkhill Meats Limited
3900 Elginfield Road
Parkhill,
ON
N0M 2K0
Canada
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) to establish a stormwater management works facility serving an existing meat processing plant, in support of a proposed expansion development of a site located at 3900 Elginfield Road, on the north side of Elginfield Road, east of McLean Road and west of Cassidy Road, in North Middlesex/Parkhill, Ontario.
The sewage works design include the supply and installation of a new stormwater management facility (dry pond) for water quantity and quantity control, which will discharge from the site to the Jansen-McLean Drain, within the Mud Creek/Lake Huron Watershed.
The proposal further includes the supply and installation of a wash water/non‐agricultural source materials tank. The proposed meat packing/processing facility expansion involves a complete washdown of the processing area and the washdown wastewater (by pressure washing) will be sent to the 367,000 litres wash water/non‐agricultural source holding tank located on the north side of the facility through floor drains that are located throughout the processing facility.
The wastewater will first flow through an oil/grease separator tank after which it will flow into the wastewater tank. The wastewater will be then pumped into a tanker truck which will transport the wastewater to an approved site for processing.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 10 janvier 2025
au 24 février 2025