Wolf Steel Ltd. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
025-0177
Ministry reference number
2538-DDHRLP
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
March 11, 2025 - April 25, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
April 25, 2025

Proposal summary

This proposal is for a new Environmental Compliance Approval (sewage) to install an on-site sewage system to service a proposed industrial warehouse and a manufacturing building on a site located at 17 Guest Road, in the Township of Oro-Medonte.

Location details

Site address

17 Guest Road
Township of Oro-Medonte, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Wolf Steel Ltd.
24 Napoleon Road
Barrie, ON
L4M 0G8
Canada

Proposal details

This proposal is for a new Environmental Compliance Approval (sewage) to install an on-site sewage system to service a proposed industrial warehouse and a manufacturing building on a site located at 17 Guest Road, in the Township of Oro-Medonte.

The proposed sewage works will include gravity sanitary sewers, a lift station and forcemain, a sewage treatment plant, an effluent pumping facility and a subsurface effluent disposal bed.

The sewage treatment plant will be using a moving bed biofilm reactor technology; and the design sanitary flow of the sewage treatment plant and disposal bed will be sized for a maximum daily flow of 16,800 litres/day. Additionally, proposed storm sewage works consists of two stormwater management facilities (facility 1, dry pond; and facility 2, constructed wetland pond), two jellyfish filter units (Jellyfish Filter 1 and Jellyfish Filter 2) two underground infiltration chambers (infiltration chamber 1 and chamber 2); complete with proposed storm sewers, storm drainage structures, culvert and swales; discharging within the Lake Simcoe Watershed.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice