This consultation closes at 11:59 p.m. on:
May 9, 2025
Proposal summary
This proposal is for an amendment to Permit to Take Water No. 0776-D3PFY2 for Ontario Power Generation No.. Water will be taken from 11 wells for construction dewatering purposes, located in the Town of Bowmanville, Ontario. The proposed amendment includes the addition of five wells (sandpoints).
Location details
Site address
2nd Line Road at the Holt Road Extension
Bowmanville,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Ontario Power Generation Inc.
1908 Colonel Sam Drive
Oshawa,
ON
L1H 8W8
Canada
Proposal details
This proposal is for an amendment to Permit to Take Water No. 0776-D3PFY2 for Ontario Power Generation Inc. Water will be taken from eleven 11 wells for construction dewatering purposes, located in the Town of Bowmanville, Ontario.
The proposed amendment includes the addition of five wells (sandpoints). Details of the water taking are as follows:
Permit type – amendment
Source Name: Underground Servicing Trench
- purpose: construction dewatering
- maximum rate per minute (litres): 140
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 202,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
Source Name: Building Footing
- purpose: construction dewatering
- maximum rate per minute (litres): 36
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 52,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
Source Name: SMR 1 Overburden Excavation
- purpose: construction dewatering
- maximum rate per minute (litres): 180
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 260,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
Source Name: SMR 1 Shaft Excavation
- purpose: construction dewatering
- maximum rate per minute (litres): 250
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 360,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
Source Name: CCW Outfall Shaft Excavation
- purpose: construction dewatering
- maximum rate per minute (litres): 375
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 540,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
Source Name: Forebay/ CCW Intake Shaft Excavation
- purpose: construction dewatering
- maximum rate per minute (litres): 333
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 480,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
Source Name: Cooling Water System Trench
- purpose: construction dewatering
- maximum rate per minute (litres): 280
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 404,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
Source Name: SMR 2, 3 and 4 Shafts
- purpose: construction dewatering
- maximum rate per minute (litres): 309
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 446,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
Source Name: Transmission Towers Caissons
- purpose: construction dewatering
- maximum rate per minute (litres): 66
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 96,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
Source Name: Bridge Structure Caissons
- purpose: construction dewatering
- maximum rate per minute (litres): 250
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 360,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
Source Name: Caissons for Powerhouse Structures
- purpose: construction dewatering
- maximum rate per minute (litres): 267
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 385,000
- maximum number of days of taking per year: 364
- period of taking: January 1 to December 31 for three years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada