Riverbend Park Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
025-0387
Ministry reference number
2106-DEWH8K
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
April 11, 2025 - May 26, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
May 26, 2025

Proposal summary

This proposal is for a new Environmental Compliance Approval (sewage) for modifications to existing sewage works systems servicing facilities at Riverbend Park, located at 4838 Pioneer Trail, Puslinch, Ontario.

Location details

Site address

4838 Pioneer Trail
Puslinch , ON
Canada

Site location details

Riverbend Park

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Riverbend Park Inc.
265 Rimrock Road, Unit 218
Toronto, ON
M3J 3C6
Canada

Proposal details

This proposal is for a new Environmental Compliance Approval (sewage) for modifications to existing sewage works systems servicing facilities at Riverbend Park, located at 4838 Pioneer Trail, Puslinch, Ontario.

The Park has a total of 93 existing sites and 168 sites permitted. The existing sewage systems serving the park are reaching the end of their useful lifespan and require replacement. The daily design sanitary sewage flow for Riverbend Park is approximately 74,000 litres per day. The proposed replacement of the existing sewage systems includes the installation of an advanced tertiary sewage treatment system (BNA) designed to treat the peak daily flow of up to 72,400 litres per day, with the remaining residence flows being treated by the existing conventional sewage system.

The proposed tertiary sewage treatment system will incorporate nutrient reduction for total ammonia nitrogen and phosphorus, along with UV disinfection to meet required effluent quality standards. The treated sewage effluent will be directly discharged into a culvert that leads to the Speed River. The proposed system includes multiple components, including but not limited to:

  • two equalization tanks
  • primary and secondary treatment tanks
  • a phosphorus removal system
  • tertiary filtration

The treatment process will ensure that the effluent meets all applicable regulatory requirements.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice