Riverbend Park Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
025-0387
Numéro de référence du ministère
2106-DEWH8K
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 11 avril 2025 au 26 mai 2025 (45 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
26 mai 2025

Résumé de la proposition

This proposal is for a new Environmental Compliance Approval (sewage) for modifications to existing sewage works systems servicing facilities at Riverbend Park, located at 4838 Pioneer Trail, Puslinch, Ontario.

Détails de l'emplacement

Adresse du site

4838 Pioneer Trail
Puslinch , ON
Canada

Détails de l'emplacement du site

Riverbend Park

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Riverbend Park Inc.
265 Rimrock Road, Unit 218
Toronto, ON
M3J 3C6
Canada

Détails de la proposition

This proposal is for a new Environmental Compliance Approval (sewage) for modifications to existing sewage works systems servicing facilities at Riverbend Park, located at 4838 Pioneer Trail, Puslinch, Ontario.

The Park has a total of 93 existing sites and 168 sites permitted. The existing sewage systems serving the park are reaching the end of their useful lifespan and require replacement. The daily design sanitary sewage flow for Riverbend Park is approximately 74,000 litres per day. The proposed replacement of the existing sewage systems includes the installation of an advanced tertiary sewage treatment system (BNA) designed to treat the peak daily flow of up to 72,400 litres per day, with the remaining residence flows being treated by the existing conventional sewage system.

The proposed tertiary sewage treatment system will incorporate nutrient reduction for total ammonia nitrogen and phosphorus, along with UV disinfection to meet required effluent quality standards. The treated sewage effluent will be directly discharged into a culvert that leads to the Speed River. The proposed system includes multiple components, including but not limited to:

  • two equalization tanks
  • primary and secondary treatment tanks
  • a phosphorus removal system
  • tertiary filtration

The treatment process will ensure that the effluent meets all applicable regulatory requirements.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis