This proposal was originally posted on October 29, 2025, with a 45-day comment period ending December 13, 2025. The notice did not mention the client is applying the ECA with Limited Operational Flexibility (LOF) as indicated in the application. The notice has been updated to correct this omission. The notice is re-opened for another 45-day comment period.
This consultation was open from:
June 18, 2026
to August 2, 2026
Proposal summary
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for all emissions from GFL Environmental Services Inc., a waste transfer facility, located in Oliver Paipoonge, Ontario.
Location details
Site address
26 Haniak Road
Oliver Paipoonge,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
GFL Environmental Services Inc.
100 New Park Place, Suite 500
Vaughan,
ON
L4K 0H9
Canada
Proposal details
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from GFL Environmental Services Inc., a waste transfer facility, located in Oliver Paipoonge, Ontario.
The application includes all sources at the facility, including tank farms, truck loading and shipping, tanker and truck cleaning, solidification areas, storage areas, plastic shredders, and diesel engines.
Emissions to the air from this facility include:
- benzo(a)pyrene
- carbon monoxide
- diesel
- gasoline
- kerosene
- nitrogen oxides
- suspended particulate matter, and
- noise
The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Connect with us
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Comment
Commenting is now closed.
The comment period was from June 18, 2026
to August 2, 2026