Update Announcement
This proposal was originally posted on October 29, 2025, with a 45-day comment period ending December 13, 2025. The notice did not mention the client is applying the ECA with Limited Operational Flexibility (LOF) as indicated in the application. The notice has been updated to correct this omission. The notice is re-opened for another 45-day comment period.
Cette consultation a eu lieu :
du 18 juin 2026
au 2 août 2026
Résumé de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for all emissions from GFL Environmental Services Inc., a waste transfer facility, located in Oliver Paipoonge, Ontario.
Détails de l'emplacement
Adresse du site
26 Haniak Road
Oliver Paipoonge,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
GFL Environmental Services Inc.
100 New Park Place, Suite 500
Vaughan,
ON
L4K 0H9
Canada
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from GFL Environmental Services Inc., a waste transfer facility, located in Oliver Paipoonge, Ontario.
The application includes all sources at the facility, including tank farms, truck loading and shipping, tanker and truck cleaning, solidification areas, storage areas, plastic shredders, and diesel engines.
Emissions to the air from this facility include:
- benzo(a)pyrene
- carbon monoxide
- diesel
- gasoline
- kerosene
- nitrogen oxides
- suspended particulate matter, and
- noise
The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 18 juin 2026
au 2 août 2026