Ontario Power Generation Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
025-1228
Ministry reference number
8631-DKPNA6
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
November 14, 2025 - December 29, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
December 29, 2025

Proposal summary

This proposal is for an amendment to the Environmental Compliance Approval (ECA) No. 7792-DGWK9H to support the expansion of the stormwater management system associated with the Phase II Pickering Waste Management Facility (PWMF).

Location details

Site address

1675 Montgomery Park Road
Lots 17, 18 19, 20, 21, Range 2
City of Pickering, ON
L1V 2R5
Canada

Site location details

Pickering Nuclear Generating Station

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Ontario Power Generation Inc.
1675 Montgomery Park Road
Pickering, ON
L1V 2R5
Canada

Proposal details

This proposal is for an amendment to the Environmental Compliance Approval (ECA) No. 7792-DGWK9H to support the expansion of the stormwater management system associated with the Phase II Pickering Waste Management Facility (PWMF) to accommodate two additional storage buildings referred to as the Pickering Component Storage Structure (PCSS) and Storage Building 5 (SB5), as well as the proposed Security Kiosk building.

The stormwater facility expansion includes an area of approximately 6.4 hectares that will consist of impervious area and be serviced by a series of storm sewers, ditches, catch basin/catch basin maintenance holes, and two Jellyfish filters on lands located at 1675 Montgomery Park Road, in the City of Pickering, Regional Municipality of Durham, Ontario. The stormwater will be discharged to Lake Ontario using an existing outfall.

Amendment of the ECA is also required to remove stormwater features described in the existing ECA that were not installed as part of the last PWMF – Phase II expansion. This was due to the cancellation of the previously planned Processing and Amenities Building. As a result, the stormwater features associated with these previously planned buildings were not installed.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice