This consultation closes at 11:59 p.m. on:
February 21, 2026
Proposal summary
This proposal is for a new Environmental Compliance Approval (sewage) for the upgrading of existing wastewater disposal for Camp Barcovan Trailer Park located at 133 Carter Road, Quinte West, Ontario.
This upgrading is necessary due to the underperformance of the existing undersized distribution beds.
Location details
Site address
133 Carter Road
Carrying Place
City of Quinte West,
ON
Canada
Site location details
Camp Barcovan Tent and RV Park
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
825678 Ontario Inc.
133 Carter Road
Carrying Place,
ON
K0K 1L0
Canada
Proposal details
This proposal is for a new Environmental Compliance Approval (sewage) for the upgrading of existing wastewater disposal for Camp Barcovan Trailer Park located at 133 Carter Road, Quinte West, Ontario.
This upgrading is necessary due to the underperformance of the existing undersized distribution beds from insufficient wastewater retention in secondary treatment, leading to system failures. A new distribution bed is to be constructed directly to the north of the occupied park, to receive all wastewater from the park.
The Camp, located on Stoneburg Cove connected to Lake Ontario, is occupied by 129 serviced trailers, 18 unserviced tent/ trailer sites, 2 cabins, a hall, residence, and dump station, all serviced by five Class 4 septic systems and supplied by water from Stoneburg Cove.
The wastewater disposal for the Camp, designed for 59,350 litres per day, will consist of five wastewater collection systems, each collecting wastewater through existing in-ground collection, to be discharged by gravity to its own central retention tank system; flowing by gravity discharge to a suitably sized pump chamber for each system; containing duplexed pumps, discharging by forcemain to a central balancing and dosing tank system; and to a new subsurface distribution bed. All pump chambers in each of the five systems and the central balancing/dosing tank will be protected by high level audio and visual alarms with battery back-up.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada