Procter & Gamble Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
026-0088
Ministry reference number
3968-DNRPYZ
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
January 23, 2026 - March 9, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
March 9, 2026

Proposal summary

This proposal is for amendment to an existing Environmental Compliance Approval (industrial sewage works) No. 0836-BYTSTU for existing stormwater management facilities to service a proposed building, with rooftop control, and small pockets of paved areas of the existing Procter and Gamble Inc. site located at 355 University Avenue in Belleville.

Location details

Site address

355 University Avenue
City of Belleville, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Procter & Gamble Inc.
4711 Yonge Street North
Toronto, ON
M2N 5M4
Canada

Proposal details

This proposal is for amendment to an existing Environmental Compliance Approval (industrial sewage works) No. 0836-BYTSTU for existing stormwater management facilities to service a proposed building, with rooftop control, and small pockets of paved areas of the existing Procter and Gamble Inc. site located at 355 University Avenue in Belleville.

The project consists of proposed development works including new parking lots (north of the site), proposed building (0.52 hectares) north of the existing building with rooftop control, and small pockets of paved areas. In the existing condition, the site is serviced by an existing dry pond, ditches, and oil grit separator (OGS). There is an existing amended Environmental Compliance Approval (ECA) permit in place for the existing dry pond, ditches, and OGS. The existing amended ECA permit number is 0836-BYTSTU (issued May 17, 2021).

The proposed stormwater management (SWM) strategy is to introduce proposed SWM features in the form of proposed dry pond (with active storage volume of 2156 cubic meters), controlled by 225 millimetres orifice and 1.25 meter weir, and 16 metre emergency spillway. The proposed dry pond provides quantity control for the proposed north parking lot. The runoff from the proposed dry pond is conveyed by grassed swale with bottom width of 1 meter, side slopes of 3H:1V and longitudinal slope of 0.3%, which provides some degree of treatment. Additional treatment is provided by the existing ditches and downstream OGS.

Future developments involving additional parking lot areas will require similar at-source or upstream proposed SWM controls. The proposed building (0.52 hectares) with rooftop control has a controlled release rate of 42 litres/second/hectares or 0.022 cubic metres per second.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice