Greenfield Global Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
026-0436
Ministry reference number
8557-DS4P2L
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
April 20, 2026 - June 4, 2026 (45 days) Closed
Last updated

This consultation was open from:
April 20, 2026
to June 4, 2026

Decision summary

We have issued an Environmental Compliance Approval to Greenfield Global Inc. for the establishment of sewage works for the collection, transmission and disposal of stormwater as well as spill containment works servicing a proposed anaerobic digestion facility located at 175 Bloomfield Road, Chatham-Kent, Ontario.

Location details

Site address

175 Bloomfield Road
Chatham-Kent, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Greenfield Global Inc.
275 Bloomfield Road
Chatham-Kent, ON
N7M 5J5
Canada

Decision details

Installation of secondary containment for process tanks/areas and transformers, comprised of:

1. Secondary Containment for Process Tanks/Areas

Above ground secondary containment areas serving the buffer tanks, digester tanks and aeration tanks, designed to be greater than combined volume of 100% of the largest tank, 10% of the aggregate volume of all remaining tanks, and the 24 hour 100-year return storm runoff volume for the containment areas, including: 

  • a bermed containment area around the tanks, interconnecting to a second containment area via a 675 mm diameter PVC pipe
  • a grassed containment area (second containment area) lined with a geosynthetic clay liner at the northeast corner of the site
  • a concrete lined area with a 0.5 m curb which serves additional outdoor process tanks and drains into the primary secondary containment area via a 250 mm PVC pipe
  • a 525 mm PVC discharging pipe equipped with a normally closed gate valve, discharging clean effluent from the secondary containment to the Southeast wet pond

One above ground rectangular secondary containment area serving the ferric chloride tank, providing a combined volume of 110% of the tank and the 24 hour 100-year return storm runoff volume for the containment area.

2. Secondary Containment for Transformers

Two semi-rectangular-shaped spill containment pits, one to accommodate the transformer in the west corner of the lot (5A), and one to accommodate the transformer north of the proposed process building (5B).

Establishment of stormwater management works to provide an Enhanced Level quality control and to attenuate post-development peak flows to less than 247 L/s for all storm events up to and including the 100-year storm event, discharging into a municipal storm sewer connection at Stormwater Manhole 02 (STM MH02), consisting of:

  • One southeast wet pond (Pond 2), receiving runoff from a catchment area of 3.66 ha (catchment areas 202 and 203)
  • One west wet pond (Pond 1), receiving runoff from a catchment area of 1.13 ha (catchment area 201) 

Comments received

Through the registry

13

By email

3

By mail

0
View comments submitted through the registry

Effects of consultation

The ministry reviewed all comments received through the ERO and also consulted with Indigenous communities that may be impacted. All comments received were carefully reviewed, and, where appropriate, were considered in the design of sewage works by the applicant’s consultant and in the ministry’s decision on whether or not to proceed with this proposal. Our review is not only based on the materials submitted by the proponent, but also available science and data and the feedback received from Indigenous communities.

The commenters raised the following concerns on the proposal with ministry’s responses.

  1. Insufficient consultation with Indigenous communities.

Ministry’s response: Consultation was conducted with the following Indigenous communities:

  • Aamjiwnaang First Nation
    • Caldwell First Nation
    • Chippewas of Kettle and Stony Point First Nation
    • Chippewas of the Thames First Nation
    • Walpole Island First Nation
    • Oneida Nation of the Thames First Nation

The Proponent consulted with all of the communities to discuss the details of the project and addressed concerns.

  1. Lack of public consultation, not following the Municipality of Chatham-Kent policies and Municipal Act requirements for consultation.

Ministry’s response: According to the Proponent, the public has been informed about the project since 2021. The project has undergone several years of planning, technical studies, and financial reviews. Council provided multiple approvals between 2021 and 2025 to continue engineering design, financial due diligence, and legal structuring.

  1. What type of guardrails and processes are in place to ensure all water is properly treated before it leaves the plant? How do we make sure anything draining into the Thames is safe?

Ministry’s response: The proposed facility has been designed as a contained operation with engineered and operational controls to prevent uncontrolled releases to the environment. Feedstocks will be received, stored, transferred, and processed within dedicated tanks, vessels, piping, and process equipment. Liquid feedstocks, process wastewater, digestate, and other contact liquids will be managed within contained systems. Any spill or leakage will be collected and contained in the secondary containment systems. All process wastewater will be pre-treated at the site and then discharged to municipal sanitary sewer for further treatment by the municipal wastewater treatment plant. Only clean stormwater will be discharged from this site. 

For stormwater from the containment area, sampling and testing will be conducted to determine whether the stormwater contains any contaminants. Only tested stormwater with all parameters below the Ministry’s trigger concentration levels can be discharged through the stormwater management system. If any parameters exceed the defined trigger concentration levels, the stormwater inside the containment will be hauled away for offsite disposal (to an approved wastewater treatment facility). Unimpacted stormwater at this site will be treated by two wet ponds to provide enhanced level quality control (80% total suspended solids removal). The final effluent of the two stormwater ponds will be the only discharge from the site to a municipal storm sewer and ultimately to Thames River. 

The approval requires the Proponent to conduct routine inspections, preventative maintenance, and spill response procedures to avoid contaminants getting into stormwater. Even if contaminants enter into stormwater, they are contained in the secondary containment systems and will be detected by sampling and testing required before any discharge. Stormwater is only allowed to discharge to the municipal storm sewer after the testing results confirm that it meets the applicable quality standards outlined in the ECA. Records of sampling, inspections, maintenance, and operational controls will be maintained in accordance with the ECA as well. 

  1. Concerns about the potential impacts this proposal could have on local waterways, wetlands, and surrounding ecosystems. If the proposed filtration or mitigation systems fail, there is also a serious risk that untreated contaminants, chemicals, or excess sediment could be released directly into nearby waterways and wetlands. Equipment malfunctions, inadequate maintenance, or system overloads during heavy rainfall events could quickly undermine environmental safeguards and lead to long-lasting ecological damage.

Ministry’s response: It is important to note that all process wastewater at this site is not discharged to the environment. Pre-treatment is provided for the process wastewater and then the pre-treated effluent will be directed to the municipal wastewater treatment plant for further treatment. This sewage ECA only covers stormwater. Secondary containment systems were designed for process areas and process tanks to avoid spill or leakage which prevents contamination to stormwater.  Any contaminated stormwater will be detected by sampling and testing prior to discharge and will be hauled away for offsite treatment. This raised concern doesn’t apply to this proposal for sewage works.

5. The public requested the below requirements to be added into the sewage approval: 

  • containment and spill-prevention measures designed so that a tank failure, overflow, or process upset cannot reach the stormwater pond or the roadside ditch untreated
  • water quality monitoring of the stormwater discharge, with parameters and limits appropriate to the Thames River as a receiving water, and public reporting of results
  • a clear separation between the facility's industrial wastewater stream and its stormwater stream, with documented assurance that organic or process water cannot enter the stormwater system
  • a defined response and reporting protocol for any exceedance or release
  • the above conditions be enforceable and that monitoring results be made publicly available

Ministry’s response: These requirements were implemented as conditions in the approved sewage ECA. 

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number
Windsor Area Office
Address

4510 Rhodes Drive
Unit 620
Windsor, ON
N8W 5K5
Canada

Office phone number

How to Appeal

This instrument decision can be appealed. You have 15 days from October 13, 2026 to begin the appeal process.

Carefully review the information below to learn more about the appeal process.

How to appealClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Issuing authority
Neryed Ragbar
Manager (A) Priority Project Approvals

Environmental Permissions Branch
135 St Clair Avenue West
Floor 3
Toronto, ON
M4V 1P5
Canada

437-776-8348

Proponent(s)

Greenfield Global Inc.
275 Bloomfield Road
Chatham-Kent, ON
N7M 5J5
Canada


Appellate body

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Include the following:

ERO number
026-0436
Ministry reference number
8557-DS4P2L

This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
026-0436
Ministry reference number
8557-DS4P2L
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

April 20, 2026 - June 4, 2026 (45 days)

Proposal details

This proposal is for a new Environmental Compliance Approval (industrial sewage) for Greenfield Global Inc. This application is for the collection, transmission and disposal of stormwater runoff at Greenfield Global Inc. 's proposed Anaerobic Digester facility located at 175 Bloomfield Road, Municipality of Chatham Kent, Ontario.

The effluent from the pond is expected to meet Provincial Water Quality Objectives. Stormwater from the Site will be managed via batch control releases from secondary containment areas, as well as via open drainage and surface runoff through a stormwater pond, which discharges to a municipal roadside ditch along Bloomfield Road and ultimately to the Thames River.

This application was submitted in conjunction with application Reference numbers 1859-DS4P8C (air) and 1692-DS4NFU (waste).

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from April 20, 2026
to June 4, 2026

Connect with us

Contact