This consultation closes at 11:59 p.m. on:
August 14, 2026
Proposal summary
This proposal is for an amendment to Environmental Compliance Approval No. 5890-CTTKVU for Kimco Steel Sales Limited for the establishment of stormwater management works, to service the proposed development of a steel laydown yard at the 1431 McAdoo’s located in the Geographic Township of Kingston, County of Frontenac.
Location details
Site address
1431 McAdoos' Lane
Kingston ,
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Kimco Steel Sales Limited
1325 John Counter Boulevard
Kingston,
ON
K7L 4W1
Canada
Proposal details
This proposal is for an amendment to Environmental Compliance Approval No. 5890-CTTKVU for Kimco Steel Sales Limited for the establishment of stormwater management works, to service the proposed development of a steel laydown yard at the 1431 McAdoo’s located in the Geographic Township of Kingston, County of Frontenac.
The total site area is approximately 20.08 ha. The stormwater management works are to collect, treat and dispose of stormwater runoff, to provide an enhanced level water quality control and erosion protection, and to attenuate post-development peak flows to the restricted 2-year pre development level for all storm events up to and including the 100-year storm event, consisting of the following:
Stormwater Management Facility (catchment area 14.55 hectares): The stormwater management works are comprised of one hybrid pond located at the south side of the development, having a quality storage volume of 2435 cubic meters and quantity storage volume of 3700.9 cubic metres, a total storage volume of 6136.8 cubic metres is provided. Quality storage shall be detained for 30 hours and released via a 150 millimetre orifice installed at the outlet structure. Quantity storage and controlled release provided by a 600 millimetre outlet sewer pipe discharging to the south of the property to an existing un-named water course, allowing a maximum discharge of 624 litres per second under the 100-year storm event. Including erosion/sedimentation control measures during construction and all other controls and appurtenances essential for the proper operation of the aforementioned Works.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada