Sunvalley Hydroponics Ltd. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
026-0975
Ministry reference number
7795-DWFRXK
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
September 25, 2026 - November 9, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
November 9, 2026

Proposal summary

This proposal is for an amendment to the Environmental Compliance Approval (ECA) No. 4822-CLPHT4 to install stormwater management (SWM) works serving Phase 3 of the proposed greenhouse expansion for the collection, transmission, treatment, and disposal of stormwater run-off from the lands located in the Town of Kingsville.

Location details

Site address

3080 Graham Side Road
Ruthven, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Sunvalley Hydroponics Ltd.
3080 Graham Side Road
Kingsville, ON
N0P 2G0
Canada

Proposal details

This proposal is for an amendment to the ECA 4822-CLPHT4 to install stormwater management (SWM) works serving Phase 3 of the proposed greenhouse expansion for the collection, transmission, treatment, and disposal of stormwater run-off from the lands located at 3080 Graham Side Road, in Part of Lot 19, Concession 5, (in the Former Geographic Township of Gosfield South) in the Town of Kingsville, County of Essex, Ontario.

The proposed sewage works facilities are all being performed in Watersheds 1 and 2 and consists of the following:

  1. Roof water drainage pipe systems and on-site sewers discharging roof-top runoff and other surface runoff into a stormwater detention pond.
  2. One stormwater detention pond serving the Phase 3 greenhouse development, related buildings, and surrounding areas. The detention pond is located west of the Phase 3 greenhouse and discharges to the Orton Sideroad Drain.
  3. One outlet structure (CBMH1) containing a 300-millimitres diameter inlet overflow pipe from the SWM pond.
  4. One pumpstation: Stormwater from the pump station will be pumped through one of two 100-millimitres diameter forcemains into CBMH1; and
  5. One emergency overflow spillway directed to the Orton Sideroad Drain for events in excess of the 150-millimitres storm
    Watershed 2 - Orton Sideroad Drain.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice