Sunvalley Hydroponics Ltd. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
026-0975
Numéro de référence du ministère
7795-DWFRXK
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 25 septembre 2026 au 9 novembre 2026 (45 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
9 novembre 2026

Résumé de la proposition

This proposal is for an amendment to the Environmental Compliance Approval (ECA) No. 4822-CLPHT4 to install stormwater management (SWM) works serving Phase 3 of the proposed greenhouse expansion for the collection, transmission, treatment, and disposal of stormwater run-off from the lands located in the Town of Kingsville.

Détails de l'emplacement

Adresse du site

3080 Graham Side Road
Ruthven, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Sunvalley Hydroponics Ltd.
3080 Graham Side Road
Kingsville, ON
N0P 2G0
Canada

Détails de la proposition

This proposal is for an amendment to the ECA 4822-CLPHT4 to install stormwater management (SWM) works serving Phase 3 of the proposed greenhouse expansion for the collection, transmission, treatment, and disposal of stormwater run-off from the lands located at 3080 Graham Side Road, in Part of Lot 19, Concession 5, (in the Former Geographic Township of Gosfield South) in the Town of Kingsville, County of Essex, Ontario.

The proposed sewage works facilities are all being performed in Watersheds 1 and 2 and consists of the following:

  1. Roof water drainage pipe systems and on-site sewers discharging roof-top runoff and other surface runoff into a stormwater detention pond.
  2. One stormwater detention pond serving the Phase 3 greenhouse development, related buildings, and surrounding areas. The detention pond is located west of the Phase 3 greenhouse and discharges to the Orton Sideroad Drain.
  3. One outlet structure (CBMH1) containing a 300-millimitres diameter inlet overflow pipe from the SWM pond.
  4. One pumpstation: Stormwater from the pump station will be pumped through one of two 100-millimitres diameter forcemains into CBMH1; and
  5. One emergency overflow spillway directed to the Orton Sideroad Drain for events in excess of the 150-millimitres storm
    Watershed 2 - Orton Sideroad Drain.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis