December 20, 2023 - January 19, 2024 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-23-000346 to Ring of Fire Metals Pty Ltd. for early exploration activities.
The decision is to issue the mineral exploration permit.
The Ministry is proposing to issue a permit to Green Technology Metals Resources (Canada) Ltd. (“the proponent”) to undertake early exploration activities.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-8637
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
May 2, 2024 - June 1, 2024 (30 days) Open
Last updated
BCP IV SERVICE STATION LP O/A BG FUELS wants to replace several tank and dispenser sump entry boots (fittings that connect piping to a containment system) with retrofit boots made by Icon Products.
January 23, 2024 - February 22, 2024 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-24-000020 to Oakhurst Exploration Corp. for early exploration activities.
The decision is to issue the mineral exploration permit.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 5302-9FSLR5 for Stelco Inc., a cold rolled steel pickling facility located in Nanticoke, Ontario.
This proposal is for an amendment to Permit to Take Water No. 6285-C5UMZG for Canadian Nuclear Laboratories Ltd. Water will be taken from Lake Ontario for restoration landscaping work at the at the Port Granby Long-Term Low-Level Radioactive Waste Repository Site, located in Port Granby, Municipality of Clarington, Ontario.
September 21, 2023 - November 5, 2023 (45 days) Closed
Last updated
Approval is granted for a new Environmental Compliance Approval for White Owl Properties Limited for the stormwater management works, to serve 2333 Cassell Drive, in the Township of Springwater, Ontario.
This proposal is for a renewal of Permit to Take Water No. 2278-9N5Q6S for Lafarge Canada Inc. Water will be taken from one pond and one well for aggregate washing purposes at the New Lowell Pit, located in Clearview, Ontario.
This proposal is for a New Environmental Compliance Approval (air & noise) for CeMix Concrete Limited, a mobile cement manufacturing facility operating in various locations across Ontario.
This proposal is to amend Environmental Compliance Approval (air & noise) No. 4995-7PRUQK issued to Miller Paving Limited a ready-mix concrete facility located at 6690 12th Line, Minto.
This proposal is for a renewal of Permit to Take Water No. 1648-9MHNVC for Creg Quay Limited. Water will be taken from three wells for communal water supply purposes in the Township of South Glengarry, Ontario.
Approval was granted for an amendment to Environmental Compliance Approval (air & noise) No. 9495-BNTS3Y for Vuteq Canada Inc., a glass windshield, side window, rear window and instrument panel manufacturing facility, located at 885 Keyes Drive in the City of Woodstock, Ontario.
August 15, 2023 - September 29, 2023 (45 days) Closed
Last updated
The ministry issued a new Environmental Compliance Approval (wastewater) serving 7137796 Canada Inc., located at 2020 Bantree Road, Ontario, serving the proposed Benson Auto Parts Wearhouse facility and will consist of stormwater management works, and storm and sanitary sewers.
January 10, 2024 - February 24, 2024 (45 days) Closed
Last updated
Approval was granted for a new Environmental Compliance Approval (air & noise) for ELECTRO-KLEEN ALLOY POLISHING LTD., a electropolishing facility, located at 2355 Tedlo Street, Mississauga, Ontario.