January 16, 2023 - February 15, 2023 (30 days) Closed
Last updated
This proposal is for the renewal of Permit to Take Water No. 6425-956QAJ, issued to C. Villeneuve Construction Co. Ltd., for pit and quarry dewatering at the Larabie Pit located in the District of Cochrane, Ontario.
We are proposing updates to the Procedures for the Use of Risk Assessment under Part XV.1 of the Environmental Protection Act document to align it with latest regulatory requirements and best practices related to brownfields risk assessment. We are seeking feedback on the document so we can improve its overall quality and usefulness.
This proposal is for a new Environmental Compliance Approval (air & noise) for ghn Infrastructure Inc. for the operation of a mobile operation of a mobile crushing plant. The equipment will be used to process recycled concrete and asphalt from the demolition of buildings, structures, roads and sidewalks throughout the Province of Ontario.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) for 1712833 Ontario Limited, a plating facility located in the City of Mississauga, Ontario.
The ministry has issued a new Environmental Compliance Approval to Pleasant Bay Bible Conference Grounds Inc. for the replacement of a failed subsurface sewage disposal works rated at 1,600 litres per day, to service a seasonal cottage located at 394 County Road 27, Lot 51, in Prince Edward County.
September 9, 2024 - October 24, 2024 (45 days) Closed
Last updated
This proposal is for a new multi-site Environmental Compliance Approval (Geothermal) for 883264 Ontario Ltd. operating as Vinson Well Drilling, to install vertical closed loop geothermal systems.
September 9, 2024 - October 24, 2024 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (sewage) for the replacement of an onsite sewage system to service Hill Island Resort, located at 37 Skydeck Road, in the Township of Leeds and the Thousand Islands, United Counties of Leeds and Grenville, Ontario.
September 9, 2024 - October 24, 2024 (45 days) Closed
Last updated
The proposal is for a new Environmental Compliance Approval for Major Kennedy South Developments Limited for stormwater management works serving a proposed residential subdivision, located in the City of Markham, Ontario.
September 9, 2024 - October 24, 2024 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from Hanon Systems EFP Canada Ltd., a manufacturer of e-compressor parts for the automotive industry, located in the City of Vaughan, Ontario.
December 20, 2023 - February 20, 2024 (62 days) Closed
Last updated
We are proposing to make regulatory changes to improve implementation of the Endangered Species Act, 2007. These changes will help us continue to deliver a species at risk program that is effective and focuses protections where they are needed most.
September 6, 2024 - October 21, 2024 (45 days) Closed
Last updated
This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 9304-9MBL5E for Fischer Canada Stainless Steel Tubing Inc., a tube manufacturing and shaping facility located at 190 Frobisher Drive in Waterloo, Ontario.
September 6, 2024 - October 21, 2024 (45 days) Closed
Last updated
This proposal is for a renewal and amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 1472-9NMR38 for Magna International Inc., a manufacturer of parts and accessories for the automotive industry, located at 225 Claireville Drive in the City of Toronto, Ontario.
January 29, 2024 - March 14, 2024 (45 days) Closed
Last updated
This proposal is for a new multi-site Environmental Compliance Approval (Geothermal) for Metropolitan Drilling Canada Inc. to install vertical closed loop geothermal systems across Ontario. The instrument was issued with conditions.
An amended Environmental Compliance Approval was issued to PPG Canada Inc., for the PPG Aerospace facility, located at 5676 Timberlea Boulevard in the City of Mississauga, Ontario.
Permit to Take Water No. 4617-D8S4M6 was issued to renewal to G. Tackaberry & Sons Construction Company Limited to renew Permit to Take Water No. 1683-9LUGLB. Water will be taken from one pond for construction, dewatering, and aggregate washing purposes at the Perth Quarry, located in the Township of Drummond-North Elmsley, Ontario.
We issued an Environmental Compliance Approval to Clean Harbors Canada, Inc. for their 520 Southgate Drive, Guelph location.
This amended approval allows a 60% increase in the storage of liquid hazardous wastes, additional solid hazardous waste storage, and the construction of an outdoor solidification pit for liquid industrial waste.
Permit to Take Water No. P-300-1273040077 was issued to Vale Canada Limited/Vale Canada Limitée on August 29, 2024, to renew Permit to Take Water No. 5833-9KAJQ2 for mining dewatering purposes. Water will be taken from three ponds, located in Greater Sudbury, Ontario for 10 years.
We want your feedback on two consultants' reports on rainwater and runoffs. This will help us develop a stormwater management guide. The ultimate goal of stormwater management is to maintain the health of streams, lakes and aquatic life.