September 9, 2024 - October 24, 2024 (45 days) Closed
Last updated
The ministry has amended existing Environmental Compliance Approval (ECA) No. 3-0386-78-006 to incorporate a change in the owner name, reflect current site use, and permit the establishment of additional stormwater management works to serve the Wessuc Inc. site at 1693 Colborne St. E. in Brantford, Ontario.
An amendment to the existing approval has been issued to TEVA Canada Limited. This approval is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6186-A26P7S for TEVA Canada Limited (TEVA), a pharmaceutical manufacturing facility located in Whitfield-Stouffville, Ontario.
December 12, 2025 - January 11, 2026 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-25-000265 to Stirling Metals Corp. for early exploration activities.
The decision is to issue the mineral exploration permit.
November 26, 2025 - January 10, 2026 (45 days) Closed
Last updated
Approval is granted to amend the existing Environmental Compliance Approval (waste disposal site) No. A-500-1188155825 for a processing facility in the City of Welland, Ontario.
This proposal is for a new Environmental Compliance Approval (Industrial Sewage) for the establishment of sewage works for the proposed transformer spill containment system, at the Ottawa Transformer Station facility, complete with containment drainage associated site development located at 2170 Mer Bleue Road, Ottawa, Ontario.
This proposal is to amend the Environmental Compliance Approval No. 3257-CRAPT7 for the stormwater management works serving the Vine Fresh Acres Ltd. Phase 3 Greenhouse Expansion Site, located at 420 Essex Road 14, and the existing Lebo Farms Ltd. greenhouse site located at 429 Mersea Road 8, both in the Municipality of Leamington.
The ministry has issued a new Environmental Compliance Approval (Sewage) to Enbridge Gas Inc. for modifications to existing stormwater management works servicing the Dawn Natural Gas Facility with associated buildings and structures, drive aisles, parking, and gravel areas located at 3332 Bentpath Line, Dawn-Euphemia Township, County of Lambton.
Instrument type:
Approval to amend a municipality’s official plan
ERO number
025-1455
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
January 30, 2026 - March 1, 2026 (30 days) Open
Last updated
The Ministry of Municipal Affairs and Housing has received Official Plan Amendment 166 (OPA 166) from the City of London for a decision. OPA 166 proposes to expand the Urban Growth Boundary for the City of London by redesignating select lands to accommodate both future residential and industrial growth over a 30-year planning horizon to 2054.
This proposal is for a new Environmental Compliance Approval (sewage) for the construction of subsurface disposal works for the collection, transmission, treatment, and disposal of domestic sewage with a design flow of 58,700 litres per day to service a proposed greenhouse and bunkhouses located at 8060 Zion Line, in the Township of Warwick.
This proposal is for a new Environmental Compliance Approval (sewage) for the construction of a sewage treatment disposal system to service the existing and proposed greenhouses, and a single family home located at 8117 Zion Line, in the Township of Warwick, County of Lambton, Ontario.
This proposal is for a new Environmental Compliance Approval for the establishment of subsurface sewage disposal works for a total of 41,900 liters per day, to service a campground located at 6 B12 Road, in the Township of Rideau Lakes.
This proposal is for a new Environmental Compliance Approval (sewage) to replace multiple onsite sewage wastewater systems with one single sewage treatment system servicing a seasonal campground site located at 2674 Front Road, in the Town of Vittoria, Ontario.