Instrument type:
Changes to the site plan for a pit or quarry
ERO number
026-0294
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
April 1, 2026 - May 1, 2026 (30 days) Open
Last updated
Béton Provincial Ltée seeks to authorize Licence 5761 to deepening the quarry floor from 44 meters above sea level (masl) to a new floor elevation of 18 masl and Licence 625349 to deepening the quarry floor from 35 masl to a new floor elevation of 18 masl.
February 18, 2026 - March 20, 2026 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-26-000028 to Graycliff Exploration Limited for early exploration activities. The decision is to issue the mineral exploration permit.
February 10, 2026 - March 12, 2026 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-000012 to GFG Resources for early exploration activities. The decision is to issue the mineral exploration.
December 8, 2025 - January 22, 2026 (45 days) Closed
Last updated
Approval is granted to operate a 2.35‑hectare facility in the City of Barrie, Ontario, for the receipt, storage, transfer, and processing of non‑hazardous waste, including dry excess soil, road sweepings, and liquid excess soil.
December 22, 2025 - February 5, 2026 (45 days) Closed
Last updated
We have issued an amended Environmental Compliance Approval with Limited Operational Flexibility (air & noise) to Linde Canada Inc., a liquid carbon dioxide manufacturing facility located at 566 Southdown Road in Mississauga, Ontario.
The proposed work program for the Methuen Township Marble Project would be a stripping and drilling bulk sampling program removing no more than 950 tonnes of material, keeping the project below the threshold of advanced exploration. The location of the bulk sampling is a near surface rock outcrop with light overburden, in a forested area.
November 3, 2025 - December 3, 2025 (30 days) Closed
Last updated
Permit to Take Water No. P-300-3382204449 has been issued to INVERARY GOLF & COUNTRY CLUB INC. for golf course irrigation and water supply purposes. Water will be taken from three drilled wells and four ponds: Clubhouse Well, Shop Well, Backup Well; and Ponds 1, 2, 3 and 4, in South Frontenac.
This notice is to inform the regulated community and the public that we are adopting updated approved air dispersion model versions under Ontario Regulation 419/05: Air Pollution – Local Air Quality. The updated model versions will take effect upon publishing of this notice.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
026-0295
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
March 31, 2026 - June 1, 2026 (62 days) Open
Last updated
Drain Bros. Excavating Limited seeks to extract below the water table in the east setbacks, which are adjacent to land also owned by Drain Bros. Excavating Limited. The amendment would allow for the existing pond to connect with the pond proposed through the adjacent expansion application.
October 31, 2025 - December 15, 2025 (45 days) Closed
Last updated
A decision was made to implement the proposals to establish a framework for issuing administrative monetary penalties and to make updates to the Outdoor Fires Regulation.
This proposal is for a new Environmental Compliance Approval (air) for 11166948 Canada Inc., operating a truck trailer manufacturing and repair facility, located in Thornloe, Ontario.
This proposal is for amendment to the existing Environmental Compliance Approval No. 6896-8YBNW8 to construct the proposed conventional onsite sewage system servicing a year-round retreat Centre located at 1033 Ashley Lane in the Township of Bracebridge, Ontario.
This proposal is for a new Environmental Compliance Approval for 1000181197 Ontario Ltd. for a hauled sewage disposal site located in Goderich, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6051-9XRRN4 for Estee Lauder Cosmetics Ltd., a cosmetic products manufacturing facility located in the City of Toronto, Ontario.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility from Atlantic Heat Treating (2001) Ltd., a heat-treating facility, located in Ajax, Ontario.
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 5231-7KGH5L for Cotton Inc., a ready-mix concrete plant located at 2125 Fruitbelt Parkway, Niagara Falls, Ontario.
This proposal is for a renewal to Permit to Take Water No. 7828-A89R6E for GILVESY ENTERPRISES INC. Water will be taken for cooling water purposes from St. Clair River in Sarnia, Ontario.
The ministry has accepted a risk assessment prepared for the owner as part of their future development plans for a property at 1140 Yonge Street, Toronto. The director is considering issuing a Certificate of Property Use.