November 10, 2026 - December 10, 2026 (30 days) Open
Last updated
This proposal is to amend existing Permit to Take Water No. 1360-BX2N2W. Water will be taken from two wells and one pond in Hornepayne for steam in a biomass co-generation power plant.
November 10, 2026 - December 25, 2026 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval for the establishment of temporary subsurface disposal works to service a proposed 85-room motel with a 60-seat restaurant located at 21198 Victoria Road, Ridgetown, Ontario.
November 10, 2026 - December 10, 2026 (30 days) Open
Last updated
This proposal is to renew existing Permit to Take Water No. 0388-D47GWS. Water will be taken from one pond and one watercourse in Halton Hills for golf course irrigation.
November 10, 2026 - December 10, 2026 (30 days) Open
Last updated
This proposal is to renew existing Permit to Take Water No. 5376-CVURB3. Water will be taken from one mine shaft in Red Lake for dewatering of underground mining works.
November 10, 2026 - December 25, 2026 (45 days) Open
Last updated
The ministry has accepted the risk assessment prepared for the owner as part of the development plans for the property at 599 to 631 Kennedy Road, Toronto. The director is considering issuing a Certificate of Property Use based on the accepted risk assessment.
November 10, 2026 - December 25, 2026 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval to install a proposed sewage works structure designed for the collection, transmission, treatment and disposal of stormwater from the non-hazardous liquid soil dewatering facility located at 1850 Bantree Street in the City of Ottawa.
Permit to Take Water No. P-300-1741082845 was issued to Esbaugh Sand & Gravel Ltd. for the Hallman Pit in the Township of Wilmot. Water will be taken from one pond for aggregate washing and dust suppression purposes.
February 13, 2026 - March 30, 2026 (45 days) Closed
Last updated
A new Environmental Compliance Approval (ECA) was issued to Thank Recycle Inc. to allow for the operation of a waste transfer and processing facility to accept ferrous and non-ferrous metal waste from local companies and projects in Ontario.
December 29, 2025 - February 12, 2026 (45 days) Closed
Last updated
An Environmental Compliance Approval (air & noise) has been granted to Summers Logging & Tree Service Ltd. for the operation of a mobile wood grinder equipped with one wood grinder and one diesel-fired engine.
December 12, 2025 - January 26, 2026 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was granted to Sunrock Industries Canada ULC, operating a ready-mix concrete plant, located in the City of Peterborough, Ontario.
December 15, 2025 - January 29, 2026 (45 days) Closed
Last updated
An Environmental Compliance Approval (air & noise) was issued to Seacliff Renewables GP Inc. as general partner for and on behalf of Seacliff Renewables LP, for its operating an organic waste recycling and bioenergy facility, located in the Municipality of Leamington, Ontario.
An amended Environmental Compliance Approval with Limited Operational was granted to Lincoln Electric Company of Canada GP two Limited, operating an aluminum wire production facility, located in Mississauga, Ontario.
The facility production limit is 13,929 tonnes of Aluminium product per year.
September 2, 2026 - October 2, 2026 (30 days) Closed
Last updated
Permit to Take Water No. P-300-6338405899 (Version 2)has been issued to R. W. TOMLINSON LIMITED, for aggregate extraction. Water will be taken from one pond in Loyalist, Ontario.
February 26, 2026 - March 28, 2026 (30 days) Closed
Last updated
Permit to Take Water No. P-300-6412218671 was issued to Dome Mine Ltd. for the Pamour Mine in Timmins, replacing Permit No. P-300-7227499147. Water will be taken for mine dewatering, drilling and water supply purposes. This amendment increases the maximum days of taking per year for the five Pamour Pit dewatering wells from 275 to 365.
November 9, 2026 - December 24, 2026 (45 days) Open
Last updated
The ministry has accepted the risk assessment prepared for the owner as part of the development plans for the property at 550 and 552 Booth Street, Ottawa, Ontario, K1A 0G2.
The director is considering issuing a Certificate of Property Use based on the accepted risk assessment.
November 6, 2026 - December 21, 2026 (45 days) Open
Last updated
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 7524-DHALFJ for Pinty's Delicious Foods Inc. for the production of processed chicken products for the food industry, located in Oakville, Ontario.
November 6, 2026 - December 21, 2026 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for BEYOND PET AND EQUINE CREMATION INC. for the operation of a animal cremation facility located in Woodstock, Ontario.
November 6, 2026 - December 21, 2026 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for 1000792458 Ontario Ltd., a cremation facility located at 890 Harrington Court, Burlington, Ontario.