February 16, 2021 - April 2, 2021 (45 days) Closed
Last updated
An amendment to Environmental Compliance Approval (air & noise) No. 1485-AJBM5Q with Limited Operational Flexibility has been granted to Labatt Brewing Company Limited for a brewery facility located in the City of London, Ontario.
A new Environmental Compliance Approval was issued to Tabitha and Donald MacDow for the establishment of sewage treatment and subsurface sewage disposal works.
July 22, 2013 - September 20, 2013 (60 days) Closed
Eabametoong First Nation and Mishkeegogamang First Nation are jointly leading preparation of a community based land use plan, working together with the Ministry of Natural Resources (MNR) within the context of the Far North Land Use Planning Initiative.
Instrument type:
Permit for activities to achieve an overall benefit to a species and/or to pay a species conservation charge (ESA s.17(2) (c))
ERO number
019-6772
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
May 26, 2023 - June 25, 2023 (30 days) Closed
Last updated
The Minister has issued an overall benefit permit for a single residential home development that may adversely impact Dwarf Hackberry and Eastern Hog-nosed Snake, which are species at risk. The permit includes actions to minimize adverse effects and overall benefit actions for the species.
The Ministry of Infrastructure has updated its Statement of Environmental Values (SEV) to reflect changes to its organizational structure and expanded mandate.
We have issued an Environmental Compliance Approval (sewage) to Jones Feed Mills Limited for the upgrades to the existing works for the collection, transmission, treatment and disposal of stormwater to service the site expansion of the Jones Feed Mills Limited, located at 1024 Alfred Street, Township of Wellesley, Ontario.
We have issued a new Environmental Compliance Approval (sewage works) for ANVO Laboratories Inc. to establish sewage works for the discharge of stormwater through an oil-grit separator unit for stormwater quality control.
We have approved a new Environmental Compliance Approval (Waste Disposal Site - processing) for the receipt/pre-processing of off-farm organic wastes and processing (anaerobic digestion) of the off-farm wastes with agricultural source materials for production of soil supplements and/or animal bedding and biogas for upgrade to renewable natural gas.
Suncor's request to replace several tank and dispenser sump entry boots (fittings that connect piping to a containment system) with retrofit boots made by Icon Products, has been approved.
Instrument type:
Requirement that licensee amend the site plan for a pit or quarry
ERO number
012-7585
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
May 9, 2016 - June 8, 2016 (30 days) Closed
Last updated
Dumont Backhoe Services, the licensee and land owner, was issued a grandfathered Class “B” licence following the designation of Nipissing District on January 1, 2007. The licence is a Category 5 – pit (below water table) on a site of 34 hectares in size.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
012-2454
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
September 17, 2014 - October 17, 2014 (30 days) Closed
Last updated
Greenwood Paving Pembroke Ltd. has submitted a proposal in relation to an overall benefit permit under clause 17(2)(c) of the Endangered Species Act, 2007 with respect to Eastern Whip-poor-will habitat in order to construct a Class ‘A’ aggregate pit in the Town of Petawawa.
February 7, 2024 - March 23, 2024 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for Everguard Coatings (International) Limited, a manufacturer of coatings for residential and commercial applications located at 7071 Oakwood Drive, Niagara Falls, Ontario.
Instrument type:
Approval to amend a municipality’s official plan
ERO number
019-8978
Notice type
Instrument
Notice stage
DecisionAppeal
Appeal posted
November 13, 2025
Decision posted
Proposal posted
Comment period
July 26, 2024 - September 9, 2024 (45 days) Closed
Last updated
A decision was made on October 10, 2025 to approve the City of Burlington Official Plan Amendment 2, as adopted by By-law No. 45-2024, with modifications. The approved Official Plan Amendment 2 amends the text and schedules of the existing Burlington Official Plan 2020 to direct future development within three Protected Major Transit Station Areas.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
011-5886
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
March 7, 2012 - April 6, 2012 (30 days) Closed
Last updated
Dewdney Mountain Farms Ltd. (c/o Paul Ritchie) has applied for a Class “A” licence, Category 4 (Quarry above Water) to excavate consolidated aggregate material from a limestone quarry of 175.0 hectares in size. This application is to establish a new quarry. The annual tonnage condition applied for is unlimited tonnage.
November 25, 2020 - January 9, 2021 (45 days) Closed
Last updated
A new Environmental Compliance Approval (sewage) was granted for an open-loop geothermal heating and cooling system at 786 Country Squire Road, in the Town of Woolwich, Ontario.