Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-2587
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
October 22, 2020 - November 21, 2020 (30 days) Closed
Last updated
Pursuant to Section 53 of the Planning Act, provisional consent was granted on December 17, 2020 in respect of Application 52-C-200046 for a lot addition of approximately 0.00721 hectares to correct an encroachment, in Hess unincorporated township, District of Sudbury. The last day this decision can be appealed is January 6, 2021.
An Environmental Compliance Approval (waste site)19-HAM-82678 for Bill’s Septic Ltd. was issued on May 27, 2019 for a hauled sewage site as described below.
We approved a new Environmental Compliance Approval (waste transfer site) for Stericycle ULC for the use and operation of a waste transfer site, with a total area of 0.46 hectares, located at Unit 2-15825 Robins Hill Road, London, Ontario.
February 16, 2018 - April 2, 2018 (45 days) Closed
Last updated
We have finalized a protocol that sets out rules for creating greenhouse gas offset credits from the collection and destruction of ozone depleting substances.
September 29, 2021 - November 13, 2021 (45 days) Closed
Last updated
The Ministry of Transportation has decided not to proceed with the proposed amendments to Ontario Regulation 306/15 (Pilot Project – Automated Vehicles) and related amendments to Regulation 628 (Vehicle Permits).
Instrument type:
Approval to amend a municipality’s official plan
ERO number
019-1848
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
June 12, 2020 - July 12, 2020 (30 days) Closed
Last updated
We want to inform you that the Ministry of Municipal Affairs and Housing has received Regional Official Plan Amendment 33 (ROPA 33) from Peel Region for a decision. ROPA 33 proposes to expand the City of Mississauga's settlement area boundary within the Peel Region Official Plan by approximately 350 hectares.
Instrument type:
Minister's directions to ministry employees and agents to rehabilitate a mine hazard in an emergency
ERO number
019-9442
Notice type
Instrument
Notice stage
Exception
Exception posted
Last updated
Minister's Directions were issued under section 148 (3) (4) (5) of the Mining Act, to employees and agents of the Ministry of Mines to secure a mine hazard at the former Long Lake Gold Mine.
August 9, 2024 - September 23, 2024 (45 days) Closed
Last updated
We have issued an amended Environmental Compliance Approval (ECA) No. A032203 to Waste Management Canada Corporation for the Twin Creeks Environmental Centre located in Watford, Ontario.
Instrument type:
Approval to register for a technical standard for air pollution (industry standard)
ERO number
025-1357
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
January 12, 2026 - February 26, 2026 (45 days) Closed
Last updated
This proposal is for Harlin Plating Inc. located in Bolton, Ontario, to be registered under the Technical Standards Registry – Air Pollution (technical standards registry). This facility will adhere to all technical and operational requirements in the Metal Finishers – Industry Standard under the Local Air Quality Regulation (O. Reg. 419/05).
This proposal is for amendment to an existing Environmental Compliance Approval (industrial sewage works) No. 0836-BYTSTU for existing stormwater management facilities to service a proposed building, with rooftop control, and small pockets of paved areas of the existing Procter and Gamble Inc. site located at 355 University Avenue in Belleville.
Ontario has extended the temporary approach for forest operations conducted in Crown forests under the Endangered Species Act for an additional year. This will help avoid additional regulatory burden and economic strain on the forestry sector while a long-term approach is being considered.
We are notifying the public a permit has been issued for an activity that will impact Pitcher’s Thistle in order to remove a cabin on Cockburn Island, Ontario. The permit includes actions to minimize adverse effects, beneficial actions for the species as well as monitoring and reporting requirements.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-0579
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
September 17, 2019 - October 17, 2019 (30 days) Closed
Last updated
The Minister of the Environment, Conservation and Parks has issued an overall benefit permit under the Endangered Species Act, 2007 (ESA) to the Ontario Ministry of Transportation to remove and replace two Hwy 401 bridges over the Grand River in Kitchener which will impact Black Redhorse, Silver Shiner and Wavy-rayed Lampmussel and their habitats.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-0134
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
May 27, 2019 - June 26, 2019 (30 days) Closed
Last updated
The applicant is seeking a permit to harm or kill 29 Dwarf Hackberry trees, and damage and destroy 0.083 hectares of Dwarf Hackberry habitat for the purpose of developing a single residential unit and related septic system.