November 17, 2017 - January 1, 2018 (45 days) Closed
Last updated
Kirchmeier Farms Inc. has requested to withdraw their application for an amendment to Environmental Compliance Approval (waste) No.6505-7DHQCT for the processing, use and operation of organic off-farm material.
October 12, 2018 - November 26, 2018 (45 days) Closed
Last updated
An amended Environmental Compliance Approval has been issued to Responsible Energy Inc. for their facility located at 1301 Brockchem Road in Augusta Township.
November 12, 2024 - December 27, 2024 (45 days) Closed
Last updated
We have issued an Environmental Compliance Approval (air & noise) with Limited Operational Flexibility to Linamar Holdings Inc., an automotive parts manufacturing facility located in the City of Guelph, Ontario.
January 28, 2025 - March 14, 2025 (45 days) Closed
Last updated
We have issued an Environmental Compliance Approval (air) to Imperial Oil Limited, a refinery for crude and vegetable oil to produce propane and propylene, butane, gasolines, furnace fuel, diesel oil, aviation fuel, heavy fuel oil, and asphalt, located at 225 Concession 2 in Nanticoke, Ontario.
December 6, 2024 - January 20, 2025 (45 days) Closed
Last updated
An approval is granted for a Waste Disposal Site located at 3155 Carp Road, Ottawa, Ontario, for the use and operation of a liquid soil waste processing site.
August 22, 2024 - October 6, 2024 (45 days) Closed
Last updated
Approval has been granted for an amendment to the Environmental Compliance Approval (air & noise) No. 6946-9MQP8U with Limited Operational Flexibility for Atlas Roofing Corporation, a foam sheet insulation manufacturing facility, located in the City of Toronto, Ontario.
August 19, 2024 - October 3, 2024 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been granted to Sofina Foods Inc./Aliments Sofina Inc., a producer and distributer of specialty European deli meats and other grocery products, located in the City of Belleville, Ontario.
August 15, 2024 - September 29, 2024 (45 days) Closed
Last updated
An Environmental Compliance Approval (waste disposal site) was issued to an electronic and electrical equipment (EEE) and other similar metal bearing waste transfer and processing facility, located at 139 Centre Street, in the Town of Welland.
August 8, 2024 - September 22, 2024 (45 days) Closed
Last updated
Approval is granted to amend an Environmental Compliance Approval (ECA) No. A591104 for a Waste Disposal Site (transfer/processing) located at 26 Haniak Road, Rosslyn, Ontario.
July 19, 2024 - September 2, 2024 (45 days) Closed
Last updated
An Environmental Compliance Approval (air & noise) has been granted to Sunrock Industries Canada Incorporated for its Ready-Mix Concrete Batching Plant located at 85 Industrial Park drive, Fenelon Falls Kawartha Lakes City.
An new Environmental Compliance Approval (air & noise) has been issued to St. Marys Cement Inc. (Canada) operating as Canada Building Materials Co., for a ready-mix concrete plant and associated pit operations located at 468 Bishopgate Road, Brant, Ontario.
An amended Environmental Compliance Approval (air & noise) with Limited Operational Flexibility for INVISTA (Canada) Company, a multi-product chemical manufacturing facility, located in Maitland, Ontario.
January 7, 2019 - February 21, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (Air and Noise) has been granted to Aircraft Appliances and Equipment located at 150 East Drive, in the City of Brampton, Ontario.
An amended Environmental Compliance Approval (air) with Limited Operational Flexibility was issued to Groundtrax Inc., an abrasive blasting and coating facility located in the Town of Brighton, Ontario.
An Environmental Compliance Approval (air and noise) with operational flexibility was issued for BRUSSELS AGROMART LTD., a dry and liquid fertilizer, chemical herbicides and seed storage and blending facility, located in Brussel, Ontario.
We granted a Notice to the Environmental Compliance Approval with Operational Flexibility (Air & Noise) to Cargill Limited, a meat processing facility located in the City of Brampton, Ontario.