We have approved the renewal of Permit to Take Water, issued to Bruman Construction Inc. to take water from from a quarry sump, wash water pond and a diversion channel located in the City of North Bay, Ontario.
We amended Renewable Energy Approval No. 7123-9W9NH2 for Amherst Island Wind Project, located at Lot 29-76, Concession 1-3, 50 Concession 2, in Loyalist Township of County of Lennox and Addington. The amendment is to modify one wind turbine (S37) with installation and operation of a Borealis ice protection system to allow its performance testing.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-8592
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
April 30, 2024 - May 30, 2024 (30 days) Closed
Last updated
Approval was granted for a site plan amendment to allow 485,616 cubic metres of excess soil to be imported to return the site to the original grade in the City of Ottawa
December 13, 2017 - January 12, 2018 (30 days) Closed
Last updated
We are closing this notice and proposing species-specific policies (government response statements) for Blue Ash, Gypsy Cuckoo Bumble Bee and Kentucky Coffee-tree under Environmental Registry number 013-3605.
This Permit to Take Water for Daniels HR Corporation to take water is for construction-dewatering and long term foundation drainage from dewatering array and foundation drains located in the City of Toronto. The Permit to Take Water No. is 6756-C63LV6, and was issued on August 25, 2021.
Fielding Chemical Technologies Inc. requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
The proposal is for a new Environmental Compliance Approval (Sewage) for Michael Hartshorn. This application is for industrial storm sewers, located on Industrial Drive, in Wellington North Township. The new sewers will discharge to the existing storm sewers located on Industrial Drive.
The government is proposing an omnibus Bill comprising (1) Ministry of Infrastructure Centralization of Broader Real Estate Authority initiative (2) Ministry of the Environment, Conservation and Parks Environmental Assessment Act initiative
This proposal is for a new Permit to Take Water for Cobalt Camp Refinery Ltd. to take water from Lake Timiskaming for the purposes of water supply and industrial use.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-3754
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
June 1, 2021 - July 2, 2021 (31 days) Closed
Last updated
Approval was granted for a site plan amendment to allow Cedarwell Excavating Ltd.to increase the number of tonnes of aggregate to be removed annually for Licence No.625492, operating in the Municipality of West Grey, County of Grey.
Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-7050
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
May 5, 2023 - June 4, 2023 (30 days) Closed
Last updated
Application 60-C-235866 was approved on October 20, 2023 subject to conditions. The last date to appeal the decision under the Planning Act is November 9, 2023.
Permit to Take Water No. 3842-BAPQUF was issued, which cancels and replaces Permit to Take Water No. 7665-8ULLS4. The Permit was issued on April 8, 2019 with an expiry date of March 28, 2029.
This decision is for the renewal of expired Permit to Take Water No. 7362-A6UMEB for Cardinal Golf Club Inc. to take water from the Holland Marsh Drainage Canal for golf course irrigation. A Permit to Take Water was issued to Cardinal Golf Club Inc on September 8, 2021.
We have granted an Environmental Compliance Approval with Limited Operational Flexibility (air) for all emissions from C. Villeneuve Construction Co. Ltd., for a concrete plant to be constructed on Highway 11 West in the Town of Hearst, District of Cochrane, Ontario.
December 6, 2019 - January 5, 2020 (30 days) Closed
Last updated
Permit to Take Water No. 2204-BMCM7X was issued, which cancels and replaces Permit to Take Water No. 0067-7ZHPM4. The permit was issued on March 3, 2020 with an expiry date of February 28, 2030.
December 21, 2018 - April 2, 2019 (45 days) Closed
Last updated
We have approved the amendment to Environmental Compliance Approval No. A580732 for the establishment of a contaminant attenuation zone for the German Waste Disposal Site in the Township of German, Ontario.
We are amending the Protocol for analytical methods used in the assessment of properties and excess soil quality under Part XV.1 of the Environmental Protection Act (version 3.0) to clarify the document title as well as the method principle related to the parameter cyanide.