This proposal is for a renewal of Permit to Take Water No. 1213-933SR9 for mining, dewatering and water supply purposes. Water will be taken from one lake, two ponds and two wells at the Kearney Mine, located in Kearney, Ontario.
November 21, 2024 - December 21, 2024 (30 days) Closed
Last updated
This proposal is for an amendment and renewal to Permit to Take Water No. 4020-D3BJ7E for Agnico Eagle Mines Limited. Water will be taken from one well and two ponds for dewatering purposes at the Detour Mine, located in the Town of Cochrane, Ontario.
This proposal is for the renewal of Permit to Take Water No. 7413-9NUJHS for Vale Canada Limited for remediation purposes. Water will be taken from four wells and one pond located in Lively, District of Sudbury, Ontario.
This proposal is for an amendment to Permit to Take Water No. 8080-ALJGR5 for mining dewatering purposes. Water will be taken from four wells in Sudbury, Ontario.
This proposal is for an amendment to Environmental Compliance Approval (air & noise) No. 3847-4HVR3G for Ontario Power Generation Inc., for the emissions from the Lennox Generating Station, located at 7263 Highway 33 in Greater Napanee, Ontario.
October 28, 2024 - December 12, 2024 (45 days) Closed
Last updated
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6245-9CBRLP for TransAlta Cogeneration Ltd., as general partner for and on behalf of TransAlta Cogeneration L.P., a co-generation plant, located in the City of Ottawa, Ontario.
January 21, 2021 - March 21, 2021 (59 days) Closed
Last updated
Environmental Compliance Approval (ECA) with Limited Operational Flexibility (air) which replaces all the current ECAs for air at this facility and includes the addition of new, or historically unapproved, sources for all emissions from Suncor Energy Inc. and 1277136 Alberta Ltd., as general partners operating as Suncor Energy Products Partners
September 20, 2024 - November 4, 2024 (45 days) Closed
Last updated
This proposal is for a New Environmental Compliance Approval (air & noise) for Excel Plating Inc., operating a metal anodizing and electroplating processing plant, located in the City of Guelph, Ontario.
September 11, 2024 - October 26, 2024 (45 days) Closed
Last updated
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0643-ADUPLW for Lincoln Electric Company of Canada Limited, a welding wire and welding equipment production facility, located in the City of Toronto, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0083-A2NLT4 for ArcelorMittal Canada MP Inc. ArcelorMittal Canada PM Inc. and ArcelorMittal Canada Inc., operating as ArcelorMittal Tubular Products Canada G.P./ArcelorMittal Produits Tubulaires Canada S.E.N.C.
This proposal is for a renewal to Permit to Take Water No. 4536-A8XQNH for BONNECHERE EXCAVATING INC. Water will be taken for aggregate extraction dewatering purposes from one pond located in Laurentian Valley, Ontario.
This proposal is for a new Environmental Compliance Approval (air) for Cross Country Concrete Ontario Limited, a manufacturer of ready-mix concrete, located in Guelph, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 8357-AGPMET for Kimberly-Clark Inc., a tissue manufacturing facility located in the Town of Huntsville, Ontario.
We have not made a decision on the proposal and due to recent changes at Wasaga Beach Provincial Park, detailed updates to the proposal are required. To keep the Environmental Registry current, we are closing this posting. Previously submitted comments will be considered, where applicable, in a future management planning process for the park.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-7086
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
May 12, 2023 - June 12, 2023 (31 days) Closed
Last updated
Approval was granted for a site plan amendment to allow James Brian Ross to restore the site to grade and to allow for future agricultural uses, for a pit located in County of Simcoe.
This proposal is for a renewal to Permit to Take Water No. P-300-8334073307 for Toyota Motor Manufacturing Canada Inc. Water will be taken from one well for foundation dewatering purposes, located in the City of Cambridge, Ontario.
November 22, 2021 - January 6, 2022 (45 days) Closed
Last updated
We issued an amendment to the Environmental Compliance Approval No. 5291-9X3NDV for Jones Group Ltd. for the processing of soil slurries at the facility located at 7809 Howard Avenue in McGregor, Ontario.