August 29, 2024 - October 13, 2024 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (air and noise) has been issued to R. W. Tomlinson Limited. This Approval replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from R. W. Tomlinson Limit.
A new Environmental Compliance Approval (M&P sewage) was granted to Moco Farms Ltd., for the construction of sewage work consisting of sanitary sewers, storm sewers, and a stormwater management works, to service Moco Subdivision development, located in the Town of Grand Valley, County of Dufferin, Ontario.
We amended Renewable Energy Approval 5272-A9FHRL for North Kent Wind Project, located in an area bounded by Oldfield Line (north), Bear Line Road (west), Pioneer Line and Pine/Darrell Line (south) and Centre Side Road/Caledonia Road (east), in the Municipality of Chatham-Kent. The amendment is to outline daytime and nighttime operation requirements
August 15, 2023 - September 29, 2023 (45 days) Closed
Last updated
We issued an Environmental Compliance Approval to 515476 Ontario Limited for their 15 Bethridge Road location to add an adjacent property located at 18 Namco Road to be used for the management of excess soil.
February 12, 2019 - March 29, 2019 (45 days) Closed
Last updated
We have issued an Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise) to Soprema Inc., located in the City of Woodstock, Ontario. This facility manufactures bitumen (asphalt) membrane waterproofing product.
February 10, 2023 - March 27, 2023 (45 days) Closed
Last updated
We have retroactively issued a new Environmental Compliance Approval (industrial sewage) for compliance purposes to Ippolito Properties Limited for existing storm infrastructure and stormwater management facilities servicing a site located at 201 North Service Road, in the City of Burlington, Ontario.
An amended Environmental Compliance Approval with Limited Operational Flexibility has been granted to Greenfield Global Inc., a fuel-grade ethanol and very-high-quality (VHQ) potable alcohol manufacturing facility located in the Township of Edwardsburgh/Cardinal, Ontario.
An approval was issued to amend Environmental Compliance Approval (air & noise) No. 0004-AHJJKY for the renewal of the Limited Operational Flexibility conditions, for Vale Canada Limited, Coleman-McCreedy East mine, located in Sudbury, Ontario.
We have issued an new Environmental Compliance Approval (sewage) to 2284622 Ontario Inc., for the construction of a dry pond, a wet pond, and an oil and grit separator complete with storm and sanitary sewers, in support of a proposed residential development west of King Street in the Town of Clinton, Central Huron, Ontario.
October 30, 2019 - December 14, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval was granted to DAS Development Corporation for private stormwater management and sanitary sewage works serving a commercial development, located at 88 Lyons Court, in the Town of Wasaga Beach.
The Minister approved amendments to the Grand River Assessment Report and Source Protection Plan to update vulnerability and threats assessments for municipal residential water systems at Erb Street, Strange Street, William Street, and Blair Road in Waterloo. New non-binding policies address future liquid hydrocarbon pipeline threats.
January 28, 2022 - March 14, 2022 (45 days) Closed
Last updated
An amendment to Environmental Compliance Approval (air and noise) No. 9758-A5BPZV with Limited Operational Flexibility was issued to Kirkland Lake Gold Ltd. for the emissions from the Macassa Mine site, located in Town of Kirkland Lake, District of Timiskaming, Ontario.
October 28, 2024 - December 12, 2024 (45 days) Closed
Last updated
The establishment of industrial stormwater management works at 560/600 Slate Drive Development, located in the City of Mississauga, for the collection, transmission, treatment and disposal of stormwater run-off from a total catchment area of 9.8 hectares, to provide enhanced level water quality protection and erosion control.
November 3, 2022 - December 3, 2022 (30 days) Closed
Last updated
To make the Excess Soil Regulation more practical and focused on higher-risk movements of soil, Ontario has finalized amendments to Ontario Regulation 406/19 and the Soil Rules to remove the excess soil reuse planning requirements for projects on low-risk sites and to provide more flexibility when storing excess soil.
We have received a Notice of Material Change for the Dome Mine that will result in Goldcorp Canada Limited (Newmont Porcupine) submitting a closure plan amendment.