November 5, 2014 - January 5, 2015 (61 days) Closed
Last updated
The Niagara Escarpment Commission has amended the Niagara Escarpment Plan to accommodate the land use designation for a parcel of land located in Bruce County.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
013-3154
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
August 10, 2018 - September 24, 2018 (45 days) Closed
Last updated
Severn Aggregates Limited has applied for a Class A licence (Category 2 - Quarry Below Water) to excavate aggregate from a quarry of 138 hectares in size.
A renewal of an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was issued to Apollo Health and Beauty Care Inc., for their site located at 1 Apollo Place, in the City of Toronto, Ontario. The facility manufacturers health and beauty products with a production limit of up to 148,000 tonnes per year.
An amended Environmental Compliance Approval has been issued for industrial sewage treatment works serving St. Clair Management Corporation, as general partner for and on behalf of St. Clair Power, L.P. located at 790 Petrolia Line, in Corunna, Ontario.
November 3, 2023 - December 3, 2023 (30 days) Closed
Last updated
Certificate of Property Use No. 5681-CW2GXG was issued to the Corporation of the City of Mississauga on December 11, 2023 for the continued use of the property as a channelized creek.
The Ministry of the Environment, Conservation and Parks has released the Minister’s Annual Reports on Lake Simcoe for 2019-20 and 2021-22. These reports summarize measures taken in those years to implement the Lake Simcoe Protection Plan, as required under Section 12 (1) of the Lake Simcoe Protection Act.
December 5, 2024 - January 19, 2025 (45 days) Closed
Last updated
An amendment Environmental Compliance Approval (ECA) was granted to Southshore Greenhouses Inc. and Mucci Farms Ltd. for the amendment and consolidation of ECA numbers 3622-CJ44K5, 4487-CHR53P and 7750-CJ44YE for the expansion and modification of an existing stormwater management system in catchment area three.
September 13, 2024 - November 27, 2024 (75 days) Closed
Last updated
2825737 Ontario Inc. as general partner on behalf of SBE Limited Partnership is proposing to amend their Renewable Energy Approval (REA No. 6428-8LGLBH) for the Elmira Anaerobic Digestion Facility. This amendment will allow the facility to double its annual organic waste processing capacity and add a biogas-upgrading plant and injection station.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
011-0948
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
August 25, 2010 - September 24, 2010 (30 days) Closed
Last updated
Glen Thompson has applied for a Class “A” licence to operate a Category 2 & 3 (quarry below water table & pit above water table) to excavate aggregate from an 81 hectare site.
We amended the Renewable Energy Approval for the Bornish Wind Energy Centre to confirm joint ownership of the existing Parkhill Interconnect by Cedar Point II LP, Jericho Wind LP, Bornish Wind LP, and Kerwood Wind LP.
We amended the Renewable Energy Approval for the Adelaide Wind Energy Centre to confirm joint ownership of the existing Parkhill Interconnect by Cedar Point II LP, Jericho Wind LP, Bornish Wind LP, and Kerwood Wind LP.
December 8, 2022 - February 6, 2023 (60 days) Closed
Last updated
We have made a decision on an application for four proposed models to calculate the lifecycle GHG intensity of new bio-based content under the Cleaner Transportation Fuels Regulation. This posting serves as approval under s.7(1)(b) of the regulation. We are also providing notice of updates to the Technical Guideline pursuant to s. 177(6).
January 13, 2025 - February 27, 2025 (45 days) Closed
Last updated
Certificate of Property Use (CPU) 6872-DAAHFK was issued to 150 Steeles Milton Inc. on May 28, 2025, for future “Residential Use”, Parkland Use” and “Institutional Use”, as defined by O. Reg. 153/04 (the "Regulation"), as amended, made under the Environmental Protection Act(the "Act").
October 7, 2022 - November 6, 2022 (30 days) Closed
Last updated
Ontario intends to release the electric vehicle (EV) charging infrastructure program details in 2023, informed by feedback received on the public consultation.