Comment
1). I object to the proposed location of the new tile bed; That location floods each spring and is adjacent to the river and an inland canal, which drains into the river. Building up the tile bed in that location will produce significant changes in the existing drainage pattern. A more suitable location should be found. Away from waterways and property lines. 2). The owners of the park and their agents should be prevented from opening, operating and renting trailer sites until such time as the approved sanitary waste system is installed, inspected, approved and operational.
[Original Comment ID: 215472]
Submitted June 19, 2020 8:16 AM
Comment on
604840 Ontario Inc. - Environmental Compliance Approval (sewage)
ERO number
013-4392
Comment ID
46652
Commenting on behalf of
Comment status